7 total
OUTSIDE ELECTRICAL ALTERATIONS TO AN EXISTING CONDO DWELLING UNIT #512, OWNER CHARLES SHEEHE.
REPAIRS:REBUILD(100 SQ FT)OF MASONARY,REPLACE(250)INDIVIDUAL BRICK,TUCKPOINT(5,000 SQ FT)OF MASONARY,REPLACE(752 LINEAL FT)OF LIMESTONE COPING,REPLACE(750 LINEAL FT)OF MASONARY FLASHING.ALL WORK TO BE ALL ELEVATIONS.
REPAIRS:REBUILD(100 SQ FT)OF MASONARY,REPLACE(250)INDIVIDUAL BRICK,TUCKPOINT(5,000 SQ FT)OF MASONARY,REPLACE(752 LINEAL FT)OF LIMESTONE COPING,REPLACE(750 LINEAL FT)OF MASONARY FLASHING.ALL WORK TO BE ALL ELEVATIONS.
ROOF RECOVER ONLY - NO STRUCTURAL WORK
ERECT TWO(2)SCAFFOLD FROM 03/09/2021 TO 03/09/2022.
PATCH 10 SQ FT OF CONCRETE, REPLACE 400 SQFT & 750 SQ FT MASONRY, TUCKPOINT4000 SQFT OF MASONRY , REPLACE 15,970 L FT OF SEALANT (WINDOW/DOOR/AIR CONDITIONER PERIMETER,METAL, GLASS, LIMESTONE & MASONRY JOINTS), REPLACE 790 L FT OF LIMESTONE COPING & SILLS, PATCH 40 SQ FT OF LIMESTONE SILLS. WORK ON ALL ELEVATION; NO STRUCTURAL WORK
ERECT TWO(2) SCAFFOLDS FROM 08/11/2020 TO 08/11/2021.