LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 1 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: BASEMENT MECHANICAL ROOM.
MODERNIZATION OF ONE(1) PASSENGER AND TWO(2) FREIGHT, 2000LB CAPACITY, 18-FLOOR, 350FPM ELEVATORS, PURSUANT TO THE SCOPE OF WORK SUBMITTED.(EV002170)
CONCRETE MASONRY REPAIR / REPLACEMNT: 615SQ. FT., EXCAVATION = NO. LOCATION: DRIVEWAY RAMP (PRIVATE PROPERTY) OFF ALLEY.
NORTH ELEVATION 15TH FLOOR WEST JULIETTE BALCONY, REPAIR/REPLACE 10 STONE BALUSTER UNITS AND ONE STONE BASE UNIT AND 3 STONE BANDS, REPAIR/REPLACE UNDERLYING STEEL SUPPORT ANGLE AND FLASHING 1000 LINEAR FT., REPAIR/REPLACE 500 BRICKS, TUCK-POINT 2000 SQ. FT., ONLY
EAST ELEVATION 17TH FLOOR, REPAIR/REPLACE 2 LINTELS, REPAIR/REPLACE FLASHING, REPAIR/REPLACE 100 BACK-UP BRICKS, REPAIR/REPLACE STONE QUOINS, TOTAL 1000 SQ. FT.
ERECT ONE(1)SCAFFOLD FROM 08/26/2020 TO 08/26/2021.