4 total
REPLACE FRONT/REAR DECKS, INTERIOR ALTERATIONS OF AN EXISTING 2 STORY COACH HOUSE, PER PLANS.
SELF CERT INTERIOR ALTERATIONS TO UPPER DUPLEX UNIT IN AN EXISTING 2 DU BLDG AS PER PLANS. NO CHANGE OF USE.
2019 CBC SELF CERT INTERIOR ALTERATION TO 2 DU BUILDING WORK TO BE DONE ON 1ST AND BASEMENT LEVEL AS PER PLANS
REPAIR/REPLACE(950 SQFT)OF DRYWALL,(10)WINDOWS-REFINISH HARDWOOD FLOORS ALL SAME SIZE AND LOCATION.