6 total
CPS SCHOOL - SELF-CERT 2019 CBRC: 3 STORY BUILDING. ALTERATION FOR FULL ROOF REPLACEMENT INCLUDING COPING WORK AND MASONRY REPAIRS, ROOF MOUNTED EQUIPMENT REMOVAL AND REPLACEMENT IN KIND, AND WINDOW REPLACEMENT, RELATED TO ROOF WORK; FIRST FLOOR TOILET ROOM RENOVATIONS, INCLUDING NEW MECHANICAL, ELECTRICAL AND PLUMBING FIXTURE/DEVICE REPLACEMENTS, PLUMBING DRAIN AND VENT PIPE REPAIRS, INTERIOR FINISH REPAIRS INCLUDING WALL AND CEILING CUTTING, PATCHING, AND PAINTING. (EDUCATIONAL GROUP E-1; TYPE 1B CONSTRUCTION).
CPS SCHOOL - SELF-CERT 2019 CBRC: 3 STORY BUILDING. ALTERATION FOR FULL ROOF REPLACEMENT INCLUDING COPING WORK AND MASONRY REPAIRS, ROOF MOUNTED EQUIPMENT REMOVAL AND REPLACEMENT IN KIND, AND WINDOW REPLACEMENT, RELATED TO ROOF WORK; FIRST FLOOR TOILET ROOM RENOVATIONS, INCLUDING NEW MECHANICAL, ELECTRICAL AND PLUMBING FIXTURE/DEVICE REPLACEMENTS, PLUMBING DRAIN AND VENT PIPE REPAIRS, INTERIOR FINISH REPAIRS INCLUDING WALL AND CEILING CUTTING, PATCHING, AND PAINTING. (EDUCATIONAL GROUP E-1; TYP
FIRE ALARM - UPGRADING AN EXISTING CLASS-I FA SYSTEM IN A CHICAGO PUBLIC SCHOOL. B,1,2, &3 FLS. FEE WAIVED - CPS PROJECT.
INSTALL NEW CUSTOMER PROVIDED ATS SWITCH
INSTALL NEW TRANSFER SWITCH AND ASSOCIATED PIPE AND WIRE
2017 FIRE SERVICE UPGRADE MANDATE ON ONE (1) HYDRAULIC PASSENGER ELEVATOR IN LE MOYNE SCHOOL. PURSUANT TO THE SCOPE OF WORK SUBMITTED.100160667