9 total
REPAIR/REPLACEMENT AFFECTING 1 SYSTEMS : 1 ROOFTOP PACKAGED UNIT(AAON RN-025 3-0-EA0A-165, ROOF) . ELECTRICAL WORK UNDER THIS PERMIT = NO . LOCATIONS: 0 RESIDENTIAL UNIT(S), 0 NON-RESIDENTIAL UNIT(S), 1 INTERIOR COMMON AREAS, EXTERIOR WORK, ROOF: RTU LIKE AND KIND REPLACEMENT.
FIRE PUMP CONTROLLER REPLACEMENT
FIRE PUMP CONTROLLER REPLACEMENT
ERECT ONE (1) SCAFFOLD DATES 02/17/2023 THROUGH 02/17/2024
REPLACE BRICK,WALL TIES AND FLASHING AT THE TOP FLOOR OF NORTH ELEVATION.
REPLACE ONE COOLING TOWER WITH ONE, 350 TON, ONE CELL, TOWER TECH COOLING TOWER, LOCATED AT GRADE, AND SERVING THE TWO NEW 350 TON SMARDT CHILLERS.
REPLACE TWO CHILLERS WITH TWO, 350 TON, R134A(400#), WATER COOLED, SMARDT CENTRIFUGAL CHILLERS, LOCATED IN THE BASEMENT, AND SERVING THE ENTIRE BUILDING. BRING THE MECHANICAL ROOM UP TO CODE. CONTACT SUPERVISOR BUD GAVIN (312)743-7215 TO SCHEDULE AN INSPECTION UPON COMPLETION OF THE JOB.
MODERNIZATION OF THREE(3) 2500LB CAPACITY, 16-FLOOR, 350FPM, EWGT, PASSENGER ELEVATORS, PURSUANT TO THE SCOPE OF WORK SUBMITTED.(EV001792) CARS #5,#6,#7
REPLACE (2) MAKE UP AIR UNITS AND (1) EXHAUST FAN FOR POOL.