61 total · Page 1 of 4
PROVIDE GUARD RAIL 42 IN HIGH
ARRANGE FOR REINSPECTION REGAR
PROVIDE GUARD RAIL 42 IN HIGH
POST OWNER/MANAGERS NAME/#
ARRANGE PREMISE INSPECTION
REPAIR LINTELS
REPAIR/REBUILD GARAGE OR SHED
POST OWNER/MANAGERS NAME/#
POST OWNER/MANAGERS NAME/#
REPAIR/REBUILD GARAGE OR SHED
1HR PUB.CORRIDOR IN MULT. D.U.
INSTALL SMOKE DETECTORS
MAINTAIN EXIT SIGN ILLUMINATED
REPAIR EXTERIOR DOOR HARDWARE
INSTALL SMOKE DETECTORS
PROVIDE GUARD RAIL 42 IN HIGH
1HR PUB.CORRIDOR IN MULT. D.U.
REPAIR DOOR, INT.
MAINTAIN EXIT SIGN ILLUMINATED
REPAIR EXTERIOR DOOR HARDWARE