13 total
TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 1750 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. LOCATION: SOUTH AND SOUTH WEST ELEVATIONS.
TEMPORARY SCAFFOLDING: QTY: 3, MAX. LENGTH: 60 FT., MAX. HEIGHT: 230 FT. LOCATION: SOUTH ELEVATION AND SOUTH WEST ELEVATION. PERMIT EXPIRATION DATE: 365 DAYS FROM PERMIT ISSUED DATE
TEMPORARY SCAFFOLDING: QTY: 1, MAX. LENGTH: 125 FT., MAX. HEIGHT: 230 FT. LOCATION: NORTHEAST LOCATION OF BUILDING. PERMIT EXPIRATION DATE: 365 DAYS FROM PERMIT ISSUED DATE
TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 800 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. LOCATION: NORTHEAST ELEVATION.
MODERNIZATION OF (2) TWO EWGT PASSENGER ELEVATORS, CAR AB: 2000LBS CAPACITY @ 200FPM, 22 STOPS AND CAR S: 2000LBS CAPACITY @ 200FPM, PURSUANT TO SCOPE OF WORK SUBMITTED AND SUBJECT TO CITY OF CHICAGO DEPT. OF BUILDINGS ELEVATOR BUREAU INSPECTION (EV8100).
WINDOWS (REPLACEMENT ONLY): QTY 119 IN 13 UNITS:4A, 4B, 4C, 8C, 11C, 12C, 14B, 15B, 20A, 20B, 20C, 21B, 21C
UNIT 17A: WINDOWS (REPLACEMENT ONLY): QTY 4
NORTH AND WEST ELEVATION, TUCKPOINT AND CAULT NECESSARY 500 SQ FT
REPLACE GOVERNOR CABLE AND GOVERNOR ON ONE (1) 2000LB.CAP, 22-FLOOR EWGT PASSENGER ELEVATOR #A-B. PURSUANT TO THE SCOPE OF WORK SUBMITTED.EV008100
WINDOWS (REPLACEMENT ONLY): QTY 9
FIRE ESCAPES, REPAIR/REPLACE BOLTS, RUNGS, STRINGERS, COUNTERBALANCE AND CONNECTION SUPPORT POINTS, GUARDRAILS, HANDRAILS, GRATES, SCRAPE AND PAINT FIRE ESCAPES AND EMBEDDED POINTS
ADD BATHROOM OUTLET - 3 KITCHEN OUTLETS - EXHAUST FAN
REPLACE DOORS(4) IN UNIT 6B ONLY- SAME SIZE & LOCATION