8 total
INSTALL RECEPTACLE FOR THE DATA MODEM IN EACH UNIT
SPR 2019: INSTALLATION OF 153 "THROUGH THE WALL" PACKAGED TERMINAL HEAT PUMP (PTPH) UNITS AS A LIKE KIND REPLACEMENT OF APARTMENT WINDOW AC UNITS. PTHP UNITS INCLUDE AN ELECTRIC RESISTANCE HEATING ELEMENT AND WILL PROVIDE HEATING AND COOLING FOR THE 69 APARTMENTS. RELATED WORK INCLUDES THE DECOMMISSIONING OF COMMON BOILER HEAT IN BASEMENT OF BUILDING. EXISTING FIN TUBE RADIATORS WILL REMAIN IN PLACE IN EACH APARTMENT UNIT BUT FIN TUBE WILL BE NON-FUNCTIONAL.
**ELECTRICAL ONLY PERMIT**ELECTRICAL ONLY TO SUPPORT COM-ED SERVICE ONLY.
REPLACE (1) MAKE UP AIR UNIT.
REPLACE (6) MAU'S WTH (6) AAON 6 TON MAU'S, SELF CONTAINED, AIR COOLED, R410A, LOCATED ON THE ROOF.
CONVERT EXISTING 120V RECEPTACLES TO 240V RECEPTACLES SERVING EXISTING AC/HEATING WINDOW UNITS.
REPLACE LOUVER AND INSTALL UNIT HEATER IN BOILER ROOM.
RETROFITTING EXISTING FLOURCENT LIGHTING WITH UL LISTED LED LIGHTING