2 total
SPR 2019 CBRC: REPAIR/REPLACE REAR WOOD PORCH AND STAIRS, REPAIR/REPLACE CLAY TILES AND RE-POINT ALL MORTAR JOINT ON PARAPET WALL AS NEEDED, AS PER PLANS (OCCUPANCY GROUP R-2 & M; TYPE IIIB CONSTRUCTION)
SPR 2019 CBC REPAIRS TO EXIST. 2 STORY 3B CONSTRUCTION MASONRY BUILDING. EXIST 1ST FLR MERCANTILE GROUP M-LIQUOR/CONVENIENCE STORE & EXIST. 2ND FLR RESIDENTIAL GROUP R2 (2) APT. UNITS, NO CHANGE REPAIR/REBUILD/ TUCKPOINT EXIST. MASONRY WALLS, ALL ELEVATIONS, REPAIR MASONRY CHIMNEYS, REPLACE/REPAIR EXIST. DOOR (NORTH ELEVATION 2ND FLOOR STAIRS), NEW EXTERIOR RAILING @ BSMT. STAIRWELL (WEST ELEVATION), ADD DETECTORS AT 2ND FLOOR APTS, NEW WOOD FENCE (WEST PROPERTY LINE) & REPAIR EXISTING FENCE, R