10 total
MODERNIZATION OF THREE(3) 2000LB CAPACITY, 22-FLOOR, 350FPM, PASSENGER ELEVATORS, PURSUANT TO THE SCOPE OF WORK SUBMITTED.(EV007921)
REPAIR OF ELEVATORS PIT LIGHTS. REPLACE LIGHT FIXTURES, SWITCHES AND GFCI RECEPTACLES
REMOVE EXISTING PLUG FUSE PANEL AND INSTALL NEW RELOCATED CIRCUIT BREAKER PANEL. REMOVE EXISTING 50-AMP FEEDER AND REPLACE WITH NEW 60-AMP FEED THROUGH EXISTING CONDUIT. INSTALL NEW 60-AMP 2-POLE BREAKER AT METER BANK.
REMOVE EXISTING PLUG FUSE PANEL AND INSTALL NEW RELOCATED CIRCUIT BREAKER PANEL. REMOVE EXISTING 50-AMP FEEDER AND REPLACE WITH NEW 60-AMP FEED THROUGH EXISTING CONDUIT. INSTALL NEW 60-AMP 2-POLE BREAKER AT METER BANK.
REPLACE HOIST ROPES ON PASSENGER ELEVATOR #3, 2000LBS CAPACITY, 22 STOPS SUBJECT TO CITY OF CHICAGO DEPT. OF BUILDINGS ELEVATOR BUREAU INSPECTION (EV007921).
PERFORM CITY OF CHICAGO FIRE SERVICE MANDATE UPGRADE ON THREE(3) 2000LB CAPACITY, 22-FLOOR, EWGT, PASSENGER ELEVATORS, PURSUANT TO THE SCOPE OF WORK SUBMITTED.(EV007921) ALL ELEVATORS
ERECT FOUR(4) SCAFFOLDS FROM 06/18/2020 TO 06/18/2021.
INSTALL LOW VOLTAGE CABLE TRAY TO SUPPORT EXISTING LV WIRING IN THE MANAGEMENT OFFICE ON THE 1ST AND 2ND FLOOR
MAINTENANCE
REMOVE AND REPLACE 1ST FLR STORE FRONT WINDOW SAME SIZE AND LOCATION