5 total
CHANGE ELECTRICAL CONTRACTOR SCOOP OF WORK STILL THE SAME
SPR 2019 CBC CONSTRUCTING A PROPOSED SECOND FLOOR ADDITION TO AN EXISTING SINGLE FAMILY RESIDENCE CONSISTING OF (2) BEDROOMS AND (1) BATHROOM.FIRST FLOOR MODIFICATIONS FOR NEW STAIRWAY BY REMOVING WALLS INCLUDING ALL ASSOCIATED MECHANICAL, ELECTRICAL AND PLUMBING W/AN ATTACHED GARAGE WITH A PATIO ROOF OVERHANG, EXTERIOR REPAIRS INCLUDED PER CITY BUILDING VIOLATIONS PER PLANS, REVIEWS AND INSPECTIONS. **CERTIFIED PLANS CORRECTIONS: CONDITIONAL PERMIT SUBJECT TO FIELD INSPECTIONS **
SPR 2019 CBC CONSTRUCTING A PROPOSED SECOND FLOOR ADDITION TO AN EXISTING SINGLE FAMILY RESIDENCE CONSISTING OF (2) BEDROOMS AND (1) BATHROOM.FIRST FLOOR MODIFICATIONS FOR NEW STAIRWAY BY REMOVING WALLS INCLUDING ALL ASSOCIATED MECHANICAL, ELECTRICAL AND PLUMBING W/AN ATTACHED GARAGE WITH A PATIO ROOF OVERHANG, EXTERIOR REPAIRS INCLUDED PER CITY BUILDING VIOLATIONS PER PLANS, REVIEWS AND INSPECTIONS. **CERTIFIED PLANS CORRECTIONS: CONDITIONAL PERMIT SUBJECT TO FIELD INSPECTIONS **
FENCES: 50FT IN X 6FT IN: QTY 1
INSTALL OUT SIDE LIGHTS ON EXISTING CIRCUIT