3 total
RUN ADDITIONAL CIRCUITS, INSTALL GROUND TO WATER MAIN, REMOVE EXPOSED FLEX IN BASEMENT, INSTALL GFCIS WHERE REQUIRED, AND ADD 1 EXTERIOR LIGHT FIXTURE AT REAR DOOR.
ADDRESS PLUMBING VIOLATIONS, REPIPE KITCHEN DRAIN AND TUB DRAIN TO MAIN SEWER STACK. LOOP VENT FOR KITCHEN SINK.
NEW 100 AMP ELECTRIC SERVICE ONLY.