2 total
PLUMBING ONLY IN TWO UNITS: REPLACE WATER, WASTE AND VENT. REPLACE PLUMBIING FIXTURES- ALL WORK SAME AS EXISTING..NO WATER HEATER REPLACEMENT ON THIS PERMIT
CHANGE METER FITTING FROM TWO GANG TO THREE GANG FOR FUTURE, INSTALL THREE NEW PANELBOARDS,REMOVE ALL BX AND REPIPE AS NEEDED