2 total
PLUMBING ONLY: REMOVE OLD GALVANIZED WATER DISTRIBUTING PIPING AND REPACE WITH COPPER WATER PIPING THROUGHOUT IN SFR (ALL WORK SAME AS EXISTING)
UPGRADE EXISTING MAIN PANEL, INSTALL NEW SWITCHES, OUTLETS, & LIGHT FIXTURES ON 1ST AND 2ND FLOOR, INSTALL NEW ELECTRIC IN BASEMENT ONLY CONDUIT, SWITCHES, OUTLETS AND LIGHTS