WALKWAY REPAIR AT FRONT OF THE BUILDING BY: 1. REPLACING ROTTED RIM JOIST 2. REPLACING PLYWOOD 3. REPLACING WATERPROOFING SYSTEM 4. SISTERING THE ROTTED FLOOR JOIST AS NEEDED.
$20K
Mar 26, 2026
Bldg-Alter/RepairApartment
Alternation to demo portion of balcony on 3rd floor.