6 1/3 LAFORGE PLACE, Staten Island, NY, 10302 · New York City · 45 total events
CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR FENCE INSTALLED ON SIDEWALK/ROADWAY.
TURBINE ROOM: HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
PAA APPLICATION FOR INSTALLATION OF REINFORCEMENT OF THE BRIDGE 5 AND RAMP APPROACH THROUGH THE SKY BRIDGE 5
STEAM LINE RE-SUPPORT
INSTALLATION OF TEMPORARY ROOF PROTECTION DURING BLDG ALTERATION, FILED SEP. ROOF PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
SWITCH HOUSE: HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR FENCE INSTALLED ON SIDEWALK/ROADWAY.
BOILER HOUSE: TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
BOILER HOUSE: HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
TURBINE ROOM: TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
SWITCH HOUSE: TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR FENCE INSTALLED ON SIDEWALK/ROADWAY.
CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR FENCE INSTALLED ON SIDEWALK/ROADWAY.
CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR FENCE INSTALLED ON SIDEWALK/ROADWAY.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Temporary Standpipe during construction.
DEMOLITION OF NON-STRUCTURAL INTERIOR COMPONENTS AND BOILERS
INSTALL A TEMP EXTERIOR WALL AT THE OPENING OF THE ANNEX BUILDING MADE DUE TO THE DEMOLITION OF COAL CONVEYOR
DEMOLITION OF NON STRUCTURAL INTERIOR COMPONENTS
PMM APPLICATION IS FOR THE CHUTE
PMM APPLICATION FOR CHUTE APPLICATION
Protections and Mechanical methods for interior demolition
SPYDER CRANE USAGE FOR A 7 STORY UTILITY BUILDING
Equipment use for interior demolition
sealing tunnel openings with concrete at multiple locations in basement level of turbine building
Installation of temporary standpipe in vacant boiler house so building can be demolished.
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF SINGLE 7000 # CAPACITY PERSONNEL/MATERIAL HOIST DURING BLDG ALTERATION, FILEDSEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESSUNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AT ADJACENT PROPERTY DURING BLDG ALTERATION, FILED SEP. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF SINGLE 7000 # CAPACITY PERSONNEL/MATERIAL HOIST DURING BLDG ALTERATION, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESSUNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY.
INSTALLATION OF PLYWOOD FENCE AS PER DRAWINGS. PLYWOOD FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. FENCE TO BE INSTALLED ON SIDEWALK / ROADWAY. DOT PERMITS BY OTHERS.
Removal of existing Deluge System for GT# 3-5 Transformer & Pump House. No change in use, egress, or occupancy.
interior demolition with equipment. ADDING PARTITIONS AND OTHER EQUIPMENT LEFT AFTER ASBESTOS ABATEMENT WAS COMPLETED
Interior demo with mh eq,chute,chute shoring, & chute lifting & lowering hoist. This application also includes other temporary safety protection eq,guardrails & hole openings covers shown on plan. add partition & other eq left after asbestos abatement.
DEMOLITION MEANS AND METHODS FOR TRANSFORMERS
partial demolition of stack
DISMANTLING AND REMOVING OF COAL CONVEYOR WITH USE OF CRANE (CN # 803/22) TO PREPARE BUILDING FOR FULL DEMOLITION, FILED SEPARATELY 322109721.
INSTALLATION OF 1200 LBS CAPACITY MATERIAL ONLY HOIST DURING BUILDING DEMOLITION, FILED SEPARATELY. HOIST SHALL COMPLY WITH CH#33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCYOR EGRESS UNDER THIS APPLICATION.
Perform Facade Repairs for Con Edison's Hudson Avenue Fan House Building at the parapet & operating floor locations. Repairs represented by the following drawings: T-001.00, G-001.00, G-002.00, A-201.00.
INSTALLATION OF INTERIOR LIGHT DUTY WORK PLATFORM AS PER PLANS. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF SIDEWALK SHED AS PER PLANS FILED.
Make Alteration To Remove Part of the Existing Building's Parapet at Con Edison's Hudson Avenue Station, With No New Construction - Annex Building. Construction details depicted on drawings: T-662.00, G-663.00 And S-664.00