210 HOLDEN BOULEVARD, Staten island, NY · New York City · 20 total events
Exterior storm piping
PLUMBING for 1 family house
Retaining wall and its foundation at rear of property. Filing to legalize the wall construction per DOB ECB violation #39542541M
New Building - One Family, 3 Story Semi Detached
New Building - One Family, 3 Story Semi Detached
New Building - One Family, 3 Story Semi Detached
INSTALLATION OF 8' HIGH WOOD CONSTRUCTION FENCE.
DEMOLITION OF 1 STORY HOUSE
§ 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES OF ALL LIGHTING AND ELECTRICAL OUTLETS IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st APARTMENT FROM WEST AT NORTH
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 20 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 1, 1st APARTMENT FROM WEST AT NORTH
§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 1, 1st APARTMENT FROM WEST AT NORTH
APARTMENT ONLY
CEILING
§ 27-2010, 2011, 2012 ADMIN. CODE: REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE AT EAST YARD
ENTIRE BUILDING
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 13 SQUARE FEET ON EAST WALL AND 4 SQUARE FEET ON NORTH WALL IN THE BATHROOM LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE COUNTER TOP AT SINK CABINET IN THE KITCHEN LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE BATHROOM LOCATED AT APT 1, 1st STORY
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 2, 1st STORY