16 1/3 HOOKER PLACE, Staten Island, NY, 10302 · New York City · 29 total events
REACH 7 - THE SCOPE INCLUDES THE RELOCATION OF 3 EXISTING 12 WATERMAINS AS PART OF THE MAIN CONTRACT, ALONG W/ THE INSTALLATION OF 5 NEW VALVES AND VALVE BOXES. 1 EXISTING 6 FIRE HYDRANT LEAD WILL BE REMOVED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Redevelopment for flood barrier system. (Civil Only). No change of use, egress, or occupancy under this application.
Filing for Plumbing for EWP4 - relocation of critical utilities (ECS, water) in advance of construction of a flood barrier system for the BPCA North/West Battery Park City Resiliency project. No change to use egress or occupancy.
Filing Plumbing work for EWP5 - Construction of tide gates and stormwater lines in advance of construction of a flood barrier system for the BPCA North/West Battery Park City Resiliency project. No change to use egress or occupancy.
Filing for Structural/Foundation work for EWP5 - construction of tide gates and stormwater lines in advance of construction of a flood barrier system for the BPCA North/West Battery Park City Resiliency project. No change to use egress or occupancy.
Filing for Structural/Foundation work for EWP5 - construction of tide gates and stormwater lines in advance of construction of a flood barrier system for the BPCA North/West Battery Park City Resiliency project. No change to use egress or occupancy.
Filing for Structural/Foundation work for EWP5 - construction of tide gates and stormwater lines in advance of construction of a flood barrier system for the BPCA North/West Battery Park City Resiliency project. No change to use egress or occupancy.
Filing Support of Excavation work for EWP5 - Construction of tide gates and stormwater lines in advance of construction of a flood barrier system for the BPCA North/West Battery Park City Resiliency project. No change to use egress or occupancy.
EWP4 - (3) 6 HDPE temp waterlines in Reach 2, (2) at Stuyvesant HS, (1) at Tribecca Pointe. Mounted w/ pipe hangers as shown in the details. Insulated & heat-traced to prevent freezing. Tie-in to existing 12 watermain & existing pipe at building entry.
EWP4 - (3) 6 HDPE temp waterlines in Reach 2, (2) at Stuyvesant HS, (1) at Tribecca Pointe. Mounted w/ pipe hangers as shown in the details. Insulated & heat-traced to prevent freezing. Tie-in to existing 12 watermain & existing pipe at building entry.
New (3) Story mix use building.
EARTHWORK AND FOUNDATION WORK FOR NEW BUILDING
REDEVELOPMENT OF FLOOR BARRIER SYSTEM (STRUCTURAL WORK) PACKAGE 4. NO CHANGE OF USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION
Wagner Park redevelopment for floor barrier system. (foundation work) Package 4. No change of use egress occupancy under this application.
Wagner Park redevelopment for floor barrier system. (Earthwork/ Landscape work) Package 4. No change of use egress or occupancy under this application
REDEVELOPMENT OF FLOOD BARRIER SYSTEM. CIVIL GRADING WORK. Package 4. No change of use egress or occupancy under this application
installation of plumbing, water service piping, and sprinkler system related to New Building application
Installation of mechanical systems. Work related to NB application M00613188-I1.
Installation of temporary construction fence. No change in occupancy, use or egress.
Redevelopment for flood barrier system. (Structural Only) See comment#24
Foundation Work See comment#24
Wagner Park redevelopment for flood barrier system. (Earthwork/Landscape only)
FOR TEMPORARY CONSTRUCTION EQUIPMENT (FENCE),SUBMITTING ON BEHALF OF CONTRACTOR, NO CHANGE IN USE,OCCUPANCY OR EGRESS
New (3) Story mix use building.
Temporary use, 2 workers shed, and 2 Constructor offices.
installation of plumbing, water service piping, and sprinkler system related to New Building application
Civil Site work for Storm, Water, and Sanitary water connection. No change of use, egress, or occupancy under this application.
Herewith filing a construction fence as shown on drawings submitted herewith.
Installation of a temporary tent structure for covered outdoor dining purposes.