158 1/3 JEWETT AVENUE, Staten Island, NY, 10302 · New York City · 37 total events
Mechanical work associated with interior tenant space renovation. New bathroom exhaust fans and ductwork.
INSTALL PERMANENT STEEL SHORING FOR ONE-STORY SETBACK AND RETAINING WALLS AS INDICATEDON DRAWINGS.
Plumbing work at existing commercial tenant space. New restroom, service sink and drinking fountain. Modify existing standpipe branch per plans.
Plumbing work at existing commercial tenant space. New restroom, service sink and drinking fountain. Modify existing standpipe branch per plans.
Interior tenant fit-out at existing first floor commercial space. No change to use, occupancy or egress under this application. Prior designation of UG 6 to remain, Alteration-CO not required per BB 2025-002 and AC 28-118.3 exception.
Structural work related to General Construction application for the tenant fit out at 25 Elm Place as per plans filed herewith. This application is related to application B01050278 filed at 484 Fulton St and B01050314 filed at 490 Fulton St.
Mechanical work related to tenant fit out at 25 Elm Place as per plans filed herewith. This application is related to application B01050278 filed at 484 Fulton St and B01050314 filed at 490 Fulton St.
Installation of refrigeration system related work for the tenant fit out at 25 Elm Place as per plans filed herewith. This application is related to application B01050278 filed at 484 Fulton St and B01050314 filed at 490 Fulton St.
THIS PROJECT INCLUDES TENANT FIT OUT ON GROUND AND SECOND FLOOR, EXTERIOR WORK AND ROOF PENETRATION WORK AS PER PLAN FILED HEREWITH. RELATED MECHANICAL, PLUMBING, SPRINKLER/STANDPIPE, STRUCTURAL, REFRIGIRATION AND FIRE ALARM APPLICAITONS FILED SEPERATELY
THIS PROJECT INCLUDES TENANT FIT OUT ON GROUND AND SECOND FLOOR, EXTERIOR WORK AND ROOF PENETRATION WORK AS PER PLAN FILED HEREWITH. RELATED MECHANICAL, PLUMBING, SPRINKLER/STANDPIPE, STRUCTURAL, REFRIGIRATION AND FIRE ALARM APPLICAITONS FILED SEPERATELY
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
REPLACE AND RELOCATE PLUMBING FIXTURES FOR THE BATHROOMS AT THE SECOND STORY AND ADD EL HWH. ONLY PL WORK IS TO BE PERFORMED UNDER THIS JOB.
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - FOOD MARKET. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - LIDL. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Installation of Temporary Construction Fence. No change in occupancy, use or egress.
Sprinkler work related to tenant fit out at 25 Elm Place as per plans filed herewith. This application is related to application B01050278 filed at 484 Fulton St and B01050314 filed at 490 Fulton St.
Plumbing work related to tenant fit out at 25 Elm Place as per plans filed herewith. This application is related to application B01050278 filed at 484 Fulton St and B01050314 filed at 490 Fulton St.
REPLACE GAS BOILER.
GAS CONNECTION TO REPLACEMENT BOILER.
INSTALLATION OF SPRINKLER SYSTEM FOR NEW ARCHITECTURAL LAYOUT.
INSTALLATION OF HVAC SYSTEM FOR NEW ARCHITECTURAL LAYOUT.
Installation of new ductwork to match the new architectural layout, and installation of new kitchen exhaust, hood, and make-up air for a new kitchen.
General construction at the cellar level. No change in use or occupancy filed under this application
A 23,013 SF INTERIOR RENOVATION OF THE EXISTING 6th FLOOR,USE GROUP 6. WORK INCLUDES CONSTRUCTION OF NEW TOILET ROOMS, PARTITIONS, DOORS, FINNISHES. EXISTING SPACE IS SPRINKLED. NO CHANGE IN USE EGRESS OR OCCUPANCY.
General Structural Work taking place at the cellar level. No change in use or egress filed under this application.
Installation of new plumbing fixtures as per plans. Demolition of existing steam piping & inactive tanks. Modification of existing sprinkler system with relocated heads. No change to use, egress, or occupancy
FILING HEREWITH UNDERPINNING WORK RELATED TO SUPPORT OF EXCAVATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
Replacement of air conditioning unit for the IT room. No change in use egress and occupancy.
Installation of new plumbing fixtures as per plans. Demolition of existing steam piping & inactive tanks. Modification of existing sprinkler system with relocated heads. No change to use, egress, or occupancy
PLUMBING WORK FOR 3RD FLOOR OFFICE RENOVATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
INTERIOR RENOVATION FOR 3RD FLOOR OFFICE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY
MECHANICAL WORK FOR 3RD FLOOR OFFICE INTERIOR RENOVATION AS PER PLANS FILED HEREWITH.NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
SPRINKLER WORK FOR 3RD FLOOR OFFICE RENOVATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
PLUMBING WORK FOR 3RD FLOOR OFFICE RENOVATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST