9428 1/3 97 AVENUE, Queens, NY, 11416 · New York City · 13 total events
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF AIR CONDITIONING SPLIT SYSTEMS IN 2ND THROUGH 4TH FLOORS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Structural Reinforcement of Floors and Installation of Steel Staircase.
Filing in conjunction with GC filing M00874884-I1. Plumbing work to include removal of all existing plumbing fixtures and piping. New plumbing installations to include new kitchen sinks, bathrooms, washing machines and electric HWHs for all units.
Renovations to existing mixed- use building. Plumbing work under M00874918-I1.
Filing temporary construction fence at front exposure
No description available
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST