932-03 SPGFIELD BOULEVARD, Queens, NY, 11411 · New York City · 11 total events
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
VIO23-50203
STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION DAMAGE OBSERVED TO HAVE BEEN SUSTAINED TO CELLAR, WATER PENETRATION, EXPOSURE #2 WALL, ALONG WITH CEMENT AND FENCE POST INSTALLED DAMAGED PATIO STONE DUE TO ONGOING CONSTRUCTION WORK AT 65 4TH AVENUE.
INSTALL APPROXIMATELY 20 FEET IN LENGTH AT THE FRONT (4TH AVENUE)
STRUCTURE RENDERED NON-COMPLIANT AT TIME OF INSPECTION DAMAGE OBSERVED TO HAVE BEEN SUSTAINED TO CELLAR DUE TO BORIG COMPANY HITTING WATER MAIN AND FLOODING CELLAR THIS WAS CAUSED DUE TO BORING WORK AT 65 4 AVENUE
STRUCTURE RENDERED NON-COMPLIANT AT TIME OF INSPECTION DAMAGE OBSERVED TO HAVE BEEN SUSTAINED TO CELLAR DUE TO BORIG COMPANY HITTING WATER MAIN AND FLOODING CELLAR THIS WAS CAUSED DUE TO BORING WORK AT 65 4 AVENUE
STRUCTURE RENDERED NON-COMPLIANT AT TIME OF INSPECTION DAMAGE OBSERVED TO HAVE BEEN SUSTAINED TO CELLAR DUE TO WATER MAIN BREAK DUE TO BORING BY 63 4 AVENUE
STRUCTURE RENDERED NON-COMPLIANT AT TIME OF INSPECTION DAMAGE OBSERVED TO HAVE BEEN SUSTAINED TO CELLAR DUE TO BORIG COMPANY HITTING WATER MAIN AND FLOODING CELLAR THIS WAS CAUSED DUE TO BORING WORK AT 63-65 4 AVENUE
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT