CONSTRUCTION OF PERIMETER BARRIER WALLS INCLUDE INSTALLATION OF DRILLED PIERS AND LOCAL EXCAVATION BETWEEN THE DRILLED PIERS TO INSTALL A PRECAST PIER AND PANEL. THE ANTICIPATED AREA OF GROUND DISTURBANCE IS ABOUT 19,865 SQUARE FEET.
THE WORK DEPICTED HEREIN IS FOR THE TEMPORARY SUPPORT OF EXCAVATION (SOE) FOR EXCAVATIONS 5 FT OR GREATER INDEPTH TO ALLOW FOR THE CONSTRUCTION OF PERIMETER BARRIER WALL AT 137-23 45TH AVENUE, QUEENS, NEW YORK.
THIS JOB IS FILED FOR CONSTRUCTION FENCE FOR DEMOLITION JOB #421651064