88-18 88 STREET, Queens, NY, 11421 · New York City · 25 total events
interior renovation on the 14th floor, partitions removal
INTERIOR RENOVATION OF THE RESTAURANT, DEMO/WHITE BOX/PARTITIONS
interior renovation of the hallway on the 8th floor
Installation of new sprinkler heads on 004, 006, 008, 011, 013, 016, 018, 019, 020, 021, 022, 028, 029, 030, 038 floors. No change in use, egress or occupancy.
Exterior facade repairs as per the plans filed including: Removal/repair/replacement of spalled/cracked stone & masonry units, stone dutchman-limestone, coping stone, steel lintels/spandrel beams and metal sill. Guardrail installation. Corner Restoration.
INSTALLATION AND USE OF TEMPORARY SUPPORTED SCAFFOLDING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
interior renovation of the restaurant - plumbing work
INSTALLATION AND USE OF TEMPORARY SUSPENDED SCAFFOLD FOR FACADE INSPECTION AND REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION AND USE OF TEMPORARY SUSPENDED SCAFFOLD FOR FACADE INSPECTION AND REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
3rd Fl Setback Roof Terrace repairs per the plans: Removal of 3rd fl light vaults & closing the slab. Closing of 2nd floor elevator opening & partial removal of elevator shaft. Removal & replacement of roof membrane, flashing, dunnage & metal wall panel.
Installation of new sprinkler heads on 031, 032, 033, 035, 036, 037, 039, 040, 041, 042, 043, 044 floors. No change in use, egress or occupancy.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
interior renovation on the second floor, partition removal.
interior renovation on the 3rd floor, partitions removal
Proposed interior renovation of existing office space on the 27th floor with rearrangement & reconstruction of non- bearing int. partitions, interior wall, floor & ceiling finishes. Electrical work. No change to building bulk, egress, use or occupancy
renovation in suits 200, 704, 900, 1215, 1210, 1407, 2607, 2700, 3111.
interior renovation is s. 2625 and s. 2640
interior renovation on 39fl.
interior renovation of suite 4100.
interior renovations on the 7th floor, hallway and the bathroom.
interior renovation on 6th and 12th floor
interior renovation on 29th floor
Replace existing mechanical units on the 24th floor to the 32nd floor. No change to egress, use or occupancy.
Plumbing work on 42 fl
Replace existing mechanical unit on the 43rd floor. No change to egress. use or occupancy