844-01 SPGFIELD BOULEVARD, Queens, NY, 11411 · New York City · 33 total events
Interior demolition of non-structural partitions for an existing commercial space. No change of use, occupancy or egress
Installation of equipment as per plans filed herewith. No change to use, egress or occupancy
SPRINKLER UPDATES FOR NEW NESPRESSO RETAIL STORE AS PER PLANS FILED HEREWITH.
MECHANICAL UPDATES AS PER PLANS FILED HEREWITH FOR NEW NESPRESSO RETAIL STORE, FLOORS 001 AND CELLAR LEVEL.
STRUCTURAL UPDATES FOR NESPRESSO RETAIL STORE PER PLANS FILED HEREWITH.
PLUMBING UPDATES AS PER PLANS FILED HEREWITH FOR NEW NESPRESSO RETAIL STORE, WORK OCCURRING AT CELLAR AND FLOOR 001 LEVELS.
TENANT IMPROVEMENT FLOOR 001 AND CELLAR LEVELS FOR NEW NESPRESSO RETAIL STORE. INCLUDES NON BEARING PARTITION WALLS, FINISHES, FIXTURES AND FURNITURE THROUGHOUT. NEW ENTRY DOOR. NO CHANGE OF USE OR OCCUPANCY.
Modifications to the existing sprinkler system in the cellar as per plans. No change to use, egress or occupancy.
Modifications to the existing plumbing system on the cellar and 1st floors as per plans. No change to use, egress or occupancy.
Structural modifications for new elevator opening as per plans. No change to use, egress or occupancy.
Installation of new partitions and doors in the cellar as per plans. No change to use, egress or occupancy.
Modifications to the existing HVAC system on the cellar and 1st floors as per plans. No change to use, egress or occupancy.
INSTALLATION OF ELECTRIC DUCT HEATER AND ELECTRIC BASEBOARD HEAT FOR 5TH FLOOR TENANT. OBTAIN COC FOR EXISTING I20 TON PACKAGE UNIT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
APARTMENT ONLY
Replacement of Air-Cooled Packaged AC Unit with new VRF Heat Pump system to connect to existing air distribution within the space. No Change to Use, Occupancy or Egress.
General Construction work as shown on plans filed herewith on cellar & 1st floor. No change in use, egress, or occupancy
Modifications to the existing HVAC system on the cellar and 1st floors (AC Unit Replacement) as per plans. No change to use, egress or occupancy.
Door replacement, removal of metal ramp/curb and sidewalk patching on the 1st floor as per plans. No change to use, egress or occupancy.
Minor demolition with installation of new partitions, doors and ceilings on the cellar and 1st floor (AC Unit Replacement) as per plans. No change to use, egress or occupancy.
Installation of a temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Sprinkler demo work as shown on plans filed herewith.
plumbing demo work as shown on plans filed herewith
Mechanical demo work as shown on plans filed herewith.
Interior demo of existing partitions and finishes as shown on plans. No change in use, egress, or occupancy under this application.
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
Filing to replace existing air conditioning units with 2 HVAC spilt systems on the 14th Floor and Roof with associated duct work as per plan. No change to use, occupancy or egress.
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST