814-01 SPGFIELD BOULEVARD, Queens, NY, 11411 · New York City · 113 total events
Replacement of existing HVAC unit for first floor (Fedex Store) of premises. No change in use, egress or occupancy under this application.
Install new rough plumbing and plumbing fixtures at partial 3rd and 14th floors (Suites 310 and 1409), including pantry sinks, dishwasher with indirect waste and vacuum break, and ejector pumps. Connect new piping to existing sanitary risers. No egress
Interior General Construction: install non-load-bearing partitions, doors and frames, and finishes within existing space. No change to use, occupancy, egress, or floor area.
Interior non-structural renovation on partial 21st floor including demolition and construction of non-load-bearing partitions, new doors and frames, and interior finishes per approved plans. No change to use, occupancy, egress, zoning, or structure.
MODIFICATION OF AIR DEVICE WITH DUCTS, AND INSTALLATION OF EXHAUST FAN AND RADIATION.
Plumbing modification for interior renovation as shown herewith on drawings. No change to use, occupancy, or egress.
General construction work related to interior partitions and installing doors and frames as shown herewith drawings. No change to use, occupancy, or egress.
In suite 1709 on 17th fl, remove non bearing partitions, ductwork and finishes. No change in use, egress or occupancy
HEREWITH FILING PL WORK TO ADD NEW BRANCH PIPING AND PL FIXTURES TO EXISTING RESTROOMS ON 5TH + 14TH FLOORS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Modification of the mechanical system as shown on the drawings filed herewith. No change in use, egress, or occupancy.
Installation of interior non-loadbearing partitions and floor buildout as shown on the drawings filed herewith. No change in use, egress, or occupancy.
PLUMBING ALTERATIONS ASSOCIATED WITH INTERIOR RENOVATION OF AN EXISTING FACILITY.NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. SPRINKLER LAYOUT TO BE MODIFIED TO ACCOMMODATE NEW LAYOUT FOR TENANT FIT-OUT OF 23RD FLOOR
PLUMBING ALTERATIONS ASSOCIATED WITH INTERIOR RENOVATION OF AN EXISTING FACILITY.NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. SPRINKLER LAYOUT TO BE MODIFIED TO ACCOMMODATE NEW LAYOUT FOR TENANT FIT-OUT OF 23RD FLOOR
RENOVATION TO EXISTING RESTROOMS ON 5TH + 14TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Work to include installation of new rough plumbing and new plumbing fixtures. No change to use, egress, or occupancy.
Interior demolition of exist. non-bearing gyp. bd. partitions. Installation of new non-bearing partitions, doors, frames & finishes. No change in use, occupancy or egress.
Removal and installation of interior non-loadbearing partitions as shown on the drawings filed herewith. No change in use, egress, or occupancy.
Proposed construction of new rough plumbing & additional plumbing fixtures as per plans submitted herewith. No change to use, egress, or occupancy.
Renovate suite 510 on 5th fl, suite 1906/ 1907 on 19th fl. Non bearing partitions and finishes removal, New partitions and finishes. No change in use, egress or occupancy
Construction of interior partitions and installation of doors and frames as per plans submitted herewith. No change to use, egress, or occupancy.
TENANT FITOUT FOR AN INTERIOR RENOVATION OF RETAIL SPACE ON 1ST FL WITH A MEZZANINE LEVEL, PROPOSING NEW PARTITIONS, FLOORINGS, AND LIGHTING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Installation of new rough plumbing and new plumbing fixtures as per plans herewith. No change in Egress or occupancy.
INSTALLATION AND MODIFICATION OF PLUMBING FIXTURES AND SPRINKLER HEADS WITH PIPES.
Installation of new rough plumbing and new plumbing fixtures. As shown on plans submitted. No change in Egress or occupancy.
PROPOSED INSTALLATION OF NON-LOAD BEARING PARTITION + RENOVATION TO EXISTING 8TH FL TENANT SPACE + WEST BATHROOMS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Construction of interior partitions and installation of doors and frames. No change to use, egress, or occupancy.
REMOVAL/INSTALL OF NON-LOAD BEARING PARTITIONS IN RESTROOMS ON 23RD FL. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300 PSF
FACADE REPAIRS TO INCLUDE MASONRY REPAIRS AT THE NORTH, WEST, EAST, & SOUTH FACADE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Non bearing partition removal in suite 806, 807 on 8th fl. No change in use, egress or occupancy
Removal of non bearing partitions and finishes. Patch as required. no change in use,, egress or occupancy
FILING FOR INTERIOR ARCHTECTURAL RENOVATION OF THE 4TH FLOOR AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUAPNCY.
REMOVAL/INSTALL OF NON-LOAD BEARING PARTITIONS, FIXTURES AND FINISHES AS PER PLANS ON 19TH FL.
For suite 1612 on 16th fl, Non bearing partitions and finishes removal. No change in use, egress or occupancy
At suite 712 on 7th fl, non bearing partition and finishes removal. no change in use, egress or occupancy
INSTALLATION OF NEW PL FIXTURES IN 16TH FL RESTROOMS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
relocate exist. pantry sink and elec HWH in suite 1200 on 12th fl. Install new elec HWH, pump, pantry sink and piping for suite 1712 on 17th fl. No change in use, egress or occupancy
Renovate suite 1200 on 12th fl and suite 1712 on 17th fl. Non bearing partitions and finishes removal. new partitions and finishes. No change in use, egress or occupancy
Installation of new plumbing fixtures on roughing of existing space on the 18th floor, Suite 1809-10. as shown on plans submitted herewith. No change in use, egress or occupancy.
for suite 1703 on 17th fl, non bearing partitions, hung ceiling and finishes removal. No change in use, egress or occupancy
non bearing partitions and finishes removal. No change in use, egress, or occupancy
PROPOSED RENOVATION TO EX. RESTROOMS ON 16TH FLOOR INCLUDES DEMO/INSTALL OF NON-LOAD BEARING PARTITIONS, FIXTURES AND FINISHES AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filing for interior renovation of existing space on the 18th floor, Suite 1809 -10 including partitions, doors and finishes as shown on plans submitted herewith. No change in use, egress or occupancy.
MODIFICATION OF EXISTING SPRINKLER SYSTEM ON THE 20TH FLOOR AS SHOWN ON PLANS SUBMITTED HEREWITH.
renovate suite 1901 on 19th fl. Non bearing partition removal. New partitions and finishes. No change in use, egress or occupancy
Filing for the Installation of new AC unit(s) and related ductwork on the 20th floor as shown on plans submitted herewith. No change in use, egress or occupancy.
INSTALLATION OF PLUMBING FIXTURES ON NEW ROUGHING AS SHOWN ON DRAWINGS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filing for interior renovation of existing space on the 16th floor, Suite 1609 & 1610 including partitions, doors and finishes as shown on plans submitted herewith.
Installation of new rough plumbing and new plumbing fixtures. As shown on plans submitted. No change in Egress or occupancy.
Install new pantry sink, ejector pump and elec HWH and assoc. piping in suite 1706 on 17th fl. No change in use, egress or occupancy