785-49 SPRINGFILD BOULEVARD, Queens, NY, 11411 · New York City · 69 total events
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Plumbing work for the installation of new chillers and cooling towers
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Installation of suspended scaffold for facade inspection/repair.
Filing General Construction in relation to repairs to exiting walls and floors as required due to the removal of steam radiators (radiator removal under a separate application) and the construction of a new 9th floor chiller room.
FACADE RESTORATION INCLUDING WINDOW LINTEL REPLACEMENT, MASONRY REPLACEMENT, MORTAR RE-POINTING, SEALANT REPLCEMENT, CONCRETE PATCHING, LINTEL PAINT, STUCCO REPLACEMENT. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Plumbing, sprinkler & standpipe work for new sidewalk transformer vaults
Plumbing, sprinkler & standpipe work for new sidewalk transformer vaults
Plumbing drainage and sprinkler installation for new shaftway work
Installation of standpipe fire hose cabinet
Removal and installation of sprinkler heads
Sprinkler demolition and temporary sprinkler
PLUMBING AND SPRINKLER WORK RELATED TO NEW WALL AND FLOOR PENETRATIONS AND NEW SHAFT ENCLOSURE FOR NEW FIBER CONDUIT RISER. MISCELLANEOUS CLEAN UP SCOPE OF ALL FLOORS.
Sprinkler and plumbing demo and installation for 8th floor fit out.
Sprinkler and plumbing demo and installation for 8th floor fit out.
Plumbing drainage and sprinkler installation for new shaftway work
Selective demolition of partial cellar, 1st, 2nd, 5th, 8th, 10th and 11th floors
Interior alterations of 8th floor, including interior non-load bearing partitions and other carpentry to construct a new telephone exchange switch room, admin area and battery room.
Installation of new chillers and cooling towers in the 10th floor MERS and roof.
Installation of HVAC equipment for the 8th floor
Installation of new generators and associated risers
Plumbing, sprinkler & standpipe work for new sidewalk transformer vaults
PLUMBING AND SPRINKLER WORK RELATED TO NEW WALL AND FLOOR PENETRATIONS AND NEW SHAFT ENCLOSURE FOR NEW FIBER CONDUIT RISER. MISCELLANEOUS CLEAN UP SCOPE OF ALL FLOORS.
MECHANICAL WORK RELATED TO NEW WALL AND FLOOR PENETRATIONS AND NEW SHAFT ENCLOSURE FOR NEW FIBER CONDUIT RISER. MISCELLANEOUS CLEAN UP SCOPE OF ALL FLOORS.
NEW WALL AND FLOOR PENETRATIONS AND NEW SHAFT ENCLOSURE FOR NEW FIBER CONDUIT RISER. MISCELLANEOUS CLEAN UP SCOPE OF ALL FLOORS.
Structural framing for 8th floor fit out
Structural framing for chillers and cooling towers
Installation of a new CRAH unit on the 3rd Floor as shown on drawings submitted herewith. No change in use, egress or occupancy.
Interior alterations of 11th floor, including interior non-load bearing partitions and other carpentry to construct a new generator room with associated interior work for electrical distribution/routing.
Mechanical installation of a new heat recovery chiller and pumps on the 9th fl. chiller rm as well as installation of a new hydronic perimeter heat system on fls 1 thru 12 including a steam to HW heat exchanger, pumps, piping, and perimeter HW radiator
Mechanical demolition
Installation of new shaftway for mechanical and elecrical risers
New sidewalk transformer vaults, cellar protector room and 2nd floor substation room and work in support of new electrical service.
Structural framing & new concrete slab for the installation of a new fuel tank
FILING EXTERIOR CHIMNEY FLUE DISMANTLING AS SHOWN ON DRAWINGS SUBMITTED HEREWITH.
Structural framing & footings foundation for generator installation
Protections, demolition and general construction for the installation of a new fuel tank
Mechanical for cellar and 2nd floor
Framing as part of selective demolition for floors 012
Reinforcement of the 9th floor slab as required to support a new chiller plant as shown on plans submitted herewith. No change in use, egress or occupancy.
Concrete pads, interior walls in support of chiller plants, cooling towers and support dunnage
Structural framing and foundation for installation of new shaftway
Piping, ductwork & mechanical work for the installation of a new fuel tank and generator
Support of excavation for new sidewalk transformer vaults
Removal, relocation and installation of ductwork and mechanical equipment in new shaftway and stairs.
Structural, framing and foundation work for the creation of new sidewalk transformer vaults
INSTALLATION OF TEMPORARY SCAFFOLD AS PER PLANS DURING VERIZON REMEDIATION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
INSTALLATION OF TEMPORARY SCAFFOLD AS PER PLANS DURING VERIZON REMEDIATION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
Plumbing work for the installation of new chillers and cooling towers
Filling Mechanical in relation to 9th floor roof replacement as shown on drawings submitted herewith.