718-01 SPRINGFIELD BOULEVARD, Queens, NY, 11411 · New York City · 27 total events
CHAPEL & SACRISTY - REMOVAL AND INSTALLATION OF PLUMBING FIXTURES.
PINTARD HALL - MODIFICATION AND INSTALLATION OF SPRINKLER HEADS.
SHERRED HALL - REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS AND FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
KOHNE HALL - MODIFICATION OF PLUMBING PIPING.
CHAPEL & SACRISTY - INSTALLATION OF SPRINKLER HEADS.
SEABURY HALL - STRUCTURAL WORK INCLUDING STEEL FRAMING, SLAB ON METAL DECK, AND CMU WALLS TO SUPPORT A PROPOSED ELEVATOR SHAFT AND MECHANICAL OPENINGS. ADDITIONAL WORK INTHE ATTIC INCLUDES METAL GRATING FOR MAINTENANCE ACCESS.
SEABURY HALL - REMOVAL AND INSTALLATION OF INTERIOR PARTITONS AND FINISHES. NEW ELEVATOR SHAFT WALLS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
CHAPEL & SACRISTY - MODIFICATION OF HVAC AND INSTALLATION OF AIR HANDLER.
THE BARRICADE WITH CHAIN LINK FENC IS AT WEST 20TH ST ON THE ROAD AND WEST 21ST ST ON THE ROAD TO BE INSTALLED ON THE ROADWAY AND SHALL BE PERMITTED AT DOT. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. DOT PERMIT FILED SEPARATELY BY OTHE
THE PLYWOOD FENCE AT WEST 20TH STREET AND THE CHAIN LINK FENCE AT THE BACK OF THE BUILDING IN THE COURT YARD,
Installation of temporary debris chute as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
KOHNE HALL - MODIFICATION OF HVAC.
PINTARD HALL - RECONFIGURING OF STUDENT LOUNGE, REMOVING CLOSETS IN DORMITORY ROOMS, AND PATCHING FLOOR AT WALL REMOVAL. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
KOHNE HALL - REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS FOR RECONFIGURATION OF STUDENT LOUNGE, REMOVAL OF CLOSETS IN DORMITORY ROOMS, AND PATCHING FLOOR AT WALL REMOVAL NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of a temporarily heavy-duty sidewalk shed and overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of a temporarily heavy-duty sidewalk shed and overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Temporary tents for an event for Vanderbilt University in the courtyard. Removed at the end of the programing. No changes to existing structures, use or egress. No scope in any dwelling areas.
WIRING
WINDOW FRAME
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
FILING FOR INSTALL OF TEMPORARY MODULAR TENT AS PER PLANS SUBMITTED HEREWITH.
FILING FOR INSTALLATION OF TEMPORARY MODULAR TENT FOR EVENT. REQUIRED TPA FILED SEPARATELY.
Installation of a platform and LED screen for Avenues Graduation Ceremony commencement services scheduled for June 1, 2021