Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
REMOVAL & INSTALLATION OF NON-LOAD BEARING PARTITIONS IN CONJUNCTION WITH MINOR OFFICE INTERIOR UPDATE WITHIN THE 5TH, 10TH, & 11TH FLRS OF AN EXISTG 15-STORY OFFICE BLDG. MILLWORKS, RECONFIGURED LIGHTING, & FINISH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Relocating and replacing sprinkler heads. Replacing plumbing fixtures on existing roughing and new fixtures. No change in use, occupancy or egress under this application.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Application for the installation and use of suspended scaffold for facade repair and inspection.
General construction to update executive private bathroom. No change in use, occupancy, or egress under this application.
General construction to add additional wall to partition off existing conference room area. No change in use, occupancy, or egress under this application.
Relocate and refabricate existing and additional ductwork. No change in use, occupancy or egress under this application.
Relocating and replacing sprinkler heads. Replacing plumbing fixtures on existing roughing and new fixtures. No change in use, occupancy or egress under this application.
APPLICATION FILED FOR PLUMBING/SPRINKLER MODIFICATIONS/ADDITIONS ON THE 12TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Plumbing work as shown on plans.
General Construction to include new partitions, doors and painting. No change in use, occupancy or egress under this application.
INTERIOR RENOVATION OF EXISTING OFFICE SPACE AT 14 FLOOR. NO CHANGE TO EXISTING USE, EGRESS OR OCCUPANCY.
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 12TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS ON THE 12TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
APPLICATION FILED FOR PLUMBING/SPRINKLER MODIFICATIONS/ADDITIONS ON THE 12TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Sprinkler work as shown on plans, no change to use, egress or occupancy.