64-80 KISSENA BOULEVARD, Queens, NY · New York City · 87 total events
QC, Steam Tunnel Structural Repairs per plans: Removal & replacement of existing waterproofing membrane, flashings. Repair of spalled concrete & cracks and deteriorated reinforcement of tunnel ceilings, walls, beams, window openings, and joints.
Remsen Hall: Renovation of existing environmental lab in basement. No change to use, egress, or occupancy.
REMSEN HALL: REMOVAL OF EXISTING DUCTWORK AND EXHAUST FAN. INSTALLATION OF NEW SPLIT SYSTEM AND FUME HOOD EXHAUST FAN INCLUDES AIR DISTRIBUTION DUCT SYSTEM FOR LAB IN BASEMENT. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Remsen: Removal of sink, emergency shower, and plumbing connections for fume hoods. Installation of new sinks, emergency shower, and G, CA VAC, CW connections for fume hoods and lab tables. No change to use, egress, or occupancy.
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 104, 1st STORY, 3rd APARTMENT FROM EAST AT SOUTH
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 102, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH
ENTIRE BUILDING
ENTIRE BUILDING
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 66-20 KISSENA BOULEVARD, QUEENS AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Queens College, Delany Hall, Replacement/Recoating/Repairs of existing damaged wood framing, stucco & membrane roofing system, exterior windows, entrance concrete stair, brick masonry, clay tiles, coping and scupper at tower as per plans filed.
INSTALLATION OF NEW SIDEWALK SHED AT 66-20 KISSENA BOULEVARD, QUEENS AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
INSTALLATION OF PIPE SCAFFOLD AT AS 66-20 KISSENA BOULEVARD, QUEENS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
Queens College, Rufus King Hall Removal & replacement of existing windows with new windows (221) & AC brackets (46). Repairs of masonry at window sill. Repairs of cracked/spalled concrete at floor slab edge & roof eaves. Selant joint replacement.
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 64-14 KISSENA BOULEVARD QUEENS AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
SCIENCE BUILDING: ALTERATION OF EXISTING LABS ON 2ND FLOOR WING E: NEW PARTITIONS AND DOORWAYS FOR NON-PRODUCTION LAB. NEW FURNITURE/CASEWORK. NEW INTERIOR FINISHES. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
SCIENCE BLDG: INSTALLATION OF AIR CONTROL VALVES/REHEAT COILS/SHEET METAL DUCTWORK & DEVICES FOR AIR DISTRIBUTION, STEAM & CONDENSATE RETURN PIPING AND PIPING SPECIALITIES. NEW PERCHLORIC FUME HOOD EXHAUST FAN. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Application filed for Queens College Exterior ADA Upgrades.
INSTALLATION OF PIPE SCAFFOLD AT 64-14 KISSENA BOULEVARD QUEENS AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF NEW SIDEWALK SHED AT 64-14 KISSENA BOULEVARD QUEENS AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
mechanical work at queens college for boiler plant replacement
plumbing work at queens college for boiler plant replacement
Erect temporary tents for private function on the Quad on Saturday, September 20, 2025. No change to egress, use or occupancy.
Installation of temp platform & tents, no alt to exist structures for the Annual Student Welcome Day. TPA permit required. Producer responsible to monitor site safety & implement HWAP. All production equipment removed upon event completion
Installation of temp tents, platforms, ramps, stairs.no alt to exist structures for LGA Community College Special Events. TPA permit required. Producer responsible to monitor site safety & implement HWAP. Production equipment removed upon
Queens College, Delany Hall, Replacement/Recoating/Repairs of existing damaged wood framing, stucco & membrane roofing system, exterior windows, entrance concrete stair, brick masonry, clay tiles, coping and scupper at tower as per plans filed.
boiler replacement as per plans filed herewith.
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 65-30 KISSENA BOULEVARD, QUEENS AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF PIPE SCAFFOLD AT AS 65-30 KISSENA BOULEVARD, QUEENS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
INSTALLATION OF NEW SIDEWALK SHED AT 65-30 KISSENA BOULEVARD, QUEENS AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
mechanical work for Queens College Central Chiller Plant upgrade asper plans filed herewith. no change in use, egress or occupancy
General Construction work for Queens College Central Chiller Plant upgrade (Remsen Hall) as per plans filed herewith. No change in use, egress or occupancy.
mechanical work for Queens College Central Chiller Plant upgrade asper plans filed herewith. no change in use, egress or occupancy
mechanical work for Queens College Central Chiller Plant upgrade asper plans filed herewith. no change in use, egress or occupancy
structural work for Queens College Central Chiller Plant upgrade asper plans filed herewith. no change in use, egress or occupancy
General Construction work for Queens College Central Chiller Plant upgrade (Powdermaker) as per plans filed herewith. No change in use, egress or occupancy
ENTIRE BUILDING
ENTIRE BUILDING
Remsen: Install sprinkler piping and heads in Basement. No change to use, egress or occupancy.
ENTIRE BUILDING
ENTIRE BUILDING
REMOVAL/REPLACEMENT OF NATURAL GAS PIPING ON ROF AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
ENTIRE BUILDING
Science Bldg.: Provided 41 sprinkler heads and sprinkler piping on 2nd floor. No change to use, egress or occupancy.
Science Bldg.: Removal of Fume hoods, sinks and shower and it's plumbing connections. Installation of 11 new sinks and 3 showers with new rough-ins. Provide CA, VAC, CW connections for 4 fume hoods on 2nd floor. No change to use, egress or occupancy.
Erect temporary tents for private function on the quad on Saturday, September 21, 2024. No change to egress, use or occupancy.
plumbing piping for hvac upgrade at queens college Remsen vivarium swing space. mechanical work filed under job number Q00312014
Installation of temp tents, platforms, ramps, stairs.no alt to exist structures for LGA Community College Special Events. TPA permit required. Producer responsible to monitor site safety & implement HWAP. Production equipment removed upon event completion
Installation of temporary tents and platforms.no alteration to exist structures for Queens College Special Events Program. TPA permits required per specific events. Producer is responsible to monitor site safety & implement HWAP.
General Construction work for Queens College Central Chiller Plant upgrade (new science Building) as per plans filed herewith. No change in use, egress or occupancy
Install HVAC and associated ductwork. No change in use. egress, or occupancy.