544 50 AVENUE, Queens, NY, 11101 · New York City · 23 total events
SUBSEQUENT APPLICATION FILED TO MODIFY DUCT WORK AS PER PLAN. THERE IS NO CHANGE TO USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION.
Filing herewith application for Sprinkler modifications on 7th floor.
THIS SUBSEQUENT FILING IS IN CONJUNCTION WITH INITIAL FILING # M00950497-l1, REASON FOR THIS SUBSEQUENT IS TO PROVIDE REVISED PLANS AS PER PLUMBING INSPECTORS COMMENT DURING PLUMBING INSPECTION.
Application filed for partial 3rd floor interior renovations including: partitions, doors, ceilings and finishes as indicated on plans submitted herewith. No change in Use, Occupancy or Egress under this Application.
Filing herewith application for interior build out as per plans submitted.
Filing herewith application for HVAC modifications.
legalization of installed gas booster pump in cellar.
INSTALLATION OF TEMPORARY STOREFRONT ENCLOSURE AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. TEMPORARY ENCLOSURE TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE.
Filing herewith application for demolition on non-load bearing partitions.
Application filed for change in U.G/OG. at 1st FL, establish public assembly spaces at 1st FL & associated construction as indicated on plans submitted herewith
mechanical modification, ductwork, piping, fan, air handling, unit heater, chiller, humidifier, pumps
filed to revise the gas piping between the booster and new boilers, change pipe from 4 to 3 and the configuration of the new pipe in the boiler room has been changed to have two regulators instead of one
structural steel framing for proposed opening in existing masonry floor slab
Plumbing fixtures, removal, relocation and new installation of fixtures as per plans. Sprinkler removal of existing heads, distribution piping, pre-action system. Relocation of supply piping at 2nd FL, new heads and distribution piping at cellar and 1fl
Plumbing fixtures, removal, relocation and new installation of fixtures as per plans. Sprinkler removal of existing heads, distribution piping, pre-action system. Relocation of supply piping at 2nd FL, new heads and distribution piping at cellar and 1fl
INSTALLATION OF PLYWOOD FENCE ENCLOSURE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
MODIFICATIONS TO PLUMBING AND SPRINKLER SYSTEM
modifications to mechanical system
MODIFICATIONS TO PLUMBING AND SPRINKLER SYSTEM
INSTALLATION OF TEMPORARY 144' HIGH PIPE SCAFFOLD ORIGINATING (OFF ROOF) AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
PAA to change PSI and add new boiler serial # G-21-1356, G-21-1353 & G-21-1355. revised drawings submitted 4 existing boilers will be removed and replaced by 3 new boilers
piping work for boiler replacement
INSTALLATION OF HEAVY-DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.