FILING (2) NEW BOILERS AT THIS LOCATION. REPLACING BOILERS AND BURNERS FILED AT 58-15 CATALPA AVE WHICH HAS THE SAME BLOCK AND LOT. OIL TANK WILL BE DECOMMISSIONED AND BOILERS WILL RUN ON STRAIGHT GAS.
INSTALL NEW GAS SERVICE, METER AND GAS PIPING.
Call
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.