5-05 129 STREET, Queens, NY, 11356 · New York City · 5 total events
Complete HVAC system replacement. Existing gas fired RTU's to be replaced with DOAS/VRF HVAC system. DOAS to be air source heat pump with backup electric heat. VRF system to be split system with air source heat pumps. Lighting work included in application
New structural steel to support the MEP units.
Provide new ceilings and new enclosure to mechanical units.
Existing gas service to be terminated and capped at wall. Existing gas fired domestic water heater to be replaced with equivalent electric domestic water heater.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.