40-01 GARAGE 40 STREET, Queens, NY, 11104 · New York City · 40 total events
SP work related to LL26/04
Sp work scope
Sprinkler application in support of LL2204
SP work related to LL26/04
Sprinkler work modification
Sprinkler work in assoc with LL
Modify SPK system. Remove/relocate 3 , 24 new, remove 26, 0 extg. heads to remain (project area new work). Remove 1 1/2 in. SPK loop & replace w2 in. Disconnect extg. branches & reconnect new SPK main. SPK system to remain active during construction.
Herewith filing plans plumbing work in 'New Pantry' area. Work consists of removal & replace of existing plumbing fixtures on existing roughing. See scope of work for details. No gas work or changes to use, egress or occupancy under this application.
Sprinkler work in connection with Ll2604
Modification to HVAC system. Scope includes removal ceiling diffusers & registers, VAV box. New work: ducting, ceiling diffusers, registers, VAV boxes, thermostats. Existing Mech. equipment (in Mech. Room) to remain. No changes Use,Egress or Occupancy.
Interior renovation at 25th floor. New partitions, offices, conference room B (with new wall/glass door,) admin. areas, pantry (cabinets), door frames/doors, flooring (LVT, Carpet tile), hung ceiling tiles, paint. No changes to use, egress, or occupancy,
Interior demolition. Remove existing drywall or glass partitions & doors, carpet, wood flooring, VCT & rubber or wood base & all underlayments, millwork,counters, cabinets, coat closets, tile backsplash, ceiling grids, tiles, light fixtures, & Gyp. board
Sprinkler work in assoc with ll2204
work related to LL26/04. File to correct 37022630M, 37020741X, 37015995J
Sp work scope
PROPOSED RENOVATION OF EXISTING OFFICES ON FLOOR 22 & 23.
Modification to Sprinkler System 26th Cons/29th Marketing as indicated on plans. No changes to use, egress, or occupancy
Office renovation 26th Cons/29th Marketing Partitions w/ glass elevations for new offices, administrative areas. Pantry, file room w/ shelving, modify wall in conference room, floor finishes all per plans. No change in use, egress or occupancy.
PLUMBING MODIFICATIONS 26th Cons/29th Marketing AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Mechanical modifications 26th Cons/29th Marketing as indicated on plans. No change in use, egress or occupancy.
Proposed interior demolition existing office space @ 26th floor according to Plan Key Notes D.1,D.3, D.5,D.11. No change to use, egress or occupancy. Building has alternate floor labeling (e.g. 26th Floor Actual or Construction and 29th Floor Marketing).
SPRINKLER MODIFICATIONS TO THE (CELLAR #1-MARKETING /BAS A-CONSTRUCTION) AND (MEZZANINE - MARKETING /1ST & 2ND FLOOR-CONSTRUCTION) IN CONJUNCTION WITH THE DEMOLITION OF FM-200 SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Remove drywall or glass partitions, doors, lighting, Gyp. Board ceiling, pantry finishes. New non-bearing partitions, doors, glass partitions/doors for new offices #s 1-6, File/Copy Rm., Pantry, Acoustical hung ceiling w/ Lighting, flooring as indicated.
Modification of associated ductwork for new office layout. Removal of supply ducting. registers, volume dampers, VAV boxes, ceiling diffusers, thermostats. Install new supply ducting, registers, VAV boxes, volume dampers, ceiling diffusers. thermostats.
Herewith filing interior demo work of all interior offices and work areas. Scope consists in the removal of all existing partitions, doors, pantry finishes, (except for coat closets) all per plans. No change to use, egress, or occupancy.
Proposed interior demolition of existing office space. Work consists of removing partitions, doors, millwork, dropped ceiling, lighting except existing pantries, entry doors, and historical banking hall to remain. No change to use, egress or occupancy.
Herewith filing modification to Sprinkler System per plans. No changes to use, egress, or occupancy.
Interior office renovation: Minor interior demo vinyl flooring. New solid partitions w/ glass wall/doors to create new offices #5,6, Quiet office area, break out Rm. New partitions for Nursing & Copy Rms. Relocate LED lighting. New doors, floor finishes.
Modification of SP system per plans. Demo upright & down pendant SP heads w/ branch piping. Relocate upright SP heads office #6. Add new upright SP heads in work area & open office. Add new down pendant heads nursing, copy Rms. Branch piping as indicated.
Modify HVAC system. Removal 12x6 Supply ducts from work area w/VAV Box, Transfer duct, Grille. Install 500,800CFM VAV Boxes, Transfer ducts, 12x6,14x8,20x8 ducting w/CDs, CRs for new office #6, Quiet office, Open Office, Nursing, Copy Rms. w/ thermostats.
Herewith filing plans for interior fit-out to revise office space layouts at 29th and 30th floor. Work consists of new wall partitions for new offices and conference room with glass panels/glass doors. No change to use, egress, or occupancy.
Modification to HVAC system on floors: 029 & 030. Remove (3) supply 10x12 Ducts/Registers, VAV Boxes, Thermostats. New work consists of adding (3) supply Ducts/Registers, new VAV boxes , Thermostats. No change to use, egress, or occupancy.
SPRINKLER MODIFICATIONS TO THE 16M/13C FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
SPRINKLER MODIFICATIONS TO THE (CELLAR #1-MARKETING /BAS A-CONSTRUCTION) AND (MEZZANINE - MARKETING /1ST & 2ND FLOOR-CONSTRUCTION) IN CONJUNCTION WITH THE DEMOLITION OF FM-200 SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. SHALL COMPLY WITH CHAPTER # 33 OF THE CODE 2014, NO CHANGES TO USE, EGRESS AND OCCUPANCY.
INSTALLATION OF TEMPORARY 80' HIGH PIPE SCAFFOLD ORIGINATING (OFF SHED) FOR FACADE REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
SPRINKLER MODIFICATIONS TO THE 16M/13C FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
PLUMBING MODIFICATION TO THE 16M/13C FLOOR ASP ER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
MECHANICAL MODIFICATIONS TO THE 16M/13C FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.