38-02 B'WAY, Queens, NY, 11103 · New York City · 9 total events
Fuel Storage MULTI-COMPONENT RENOVATION (FDNY EC82 PHASE 2). REMOVAL AND REPLACEMENT OF DISEL FUEL DISPENSING SYSTEM. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Plumbing Work Multi-Component (EC 82 PHASE 2) no change of use, egress, or occupancy under this application. See comment#24
Flood repair renovation. Install new GAS Boiler as per plans for existing Firehouse (EC82 Phase 1). No change of use, egress, or occupancy under this application.
Structural Work multi-component renovation (FDNY EC 82 PHASE 2) no change of use, egress, or occupancy under this application
interior work limited to cellar and 1st floor. Interior work inclusive of removal and construction of non-load bearing walls. Additional work includes the placement of electrical and mechanical equipment. No change of use, egress or occupancy (EC82)
Interior & Exterior work limited to Cell Apparatus floor, Rooftop & Exposure 4 Facade. Interior work inclusive of removal & Const. of nonload bearing walls. Removal & placement of new apparatus floor. No change of use, egress, or occupancy (EC 82 PH 2)
MECHANICAL WORK MULTI-COMPONENT RENOVATION EC 82 (PHASE 2). NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
SCAFFOLD AD PER NYC BC. NO CHANGE IN USE, EGRESS, OR OCCUAPNCY.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.