35-53 35 AVENUE, Queens, NY, 11106 · New York City · 64 total events
Installation of 78.48 kw solar energy system on roof. No change of occupancy, use or egress
Installation of 39.785 kw solar energy system on roof. No change occupancy, use or egress
Installation of 39.785 kw solar energy system on roof. No change of occupancy, use or egress.
Installation of 39.785 kw solar energy system on roof. No change of occupancy, use or egress
Installation of 79.025 kw solar energy system on roof. No change of occupancy, use or egress
Installation of 40.33 kw solar energy system on roof. No change of occupancy, use or egress
Installation of 80.66 kw solar energy system on roof. No change occupancy, use or egress
Installation of 45.235 kw solar energy system on roof. No change of occupancy, use or egress
NYCHA BOILER_REMOVE AND REPLACE HOT WATER HEATERS AND WATER LINES, RECIRCULATION PUMPS, DRAINS . INSTALL NEW SUMP PUMPS AND DISCHARGE LINES. INSTALL NEW AIR INTAKES AND EXHAUST FOR WATER HEATERS.
Judgment: NO
REMOVE AND REPLACE OR PROVIDE NEW SUMP PUMPS AND DISCHARGE LINES.
NYCHA BOILER_REMOVE AND REPLACE HOT WATER HEATERS AND WATER LINES, RECIRCULATION PUMPS, DRAINS . INSTALL NEW SUMP PUMPS AND DISCHARGE LINES. INSTALL NEW AIR INTAKES AND EXHAUST FOR WATER HEATERS.
SUBSEQUENT FILING FOR PL WORK - STORM/DRAINAGE PIPING, DRAINS, DRYWELL RETENTION.
Infrastructure to improve management of stormwater runoff from the tributary impervious surfaces. On-site Green Infrastructure Cloudburst Pilot Project. DEP Capital Contract No. GQ-H-RAVE, Ravenswood Houses, NYCHA facility.
NYCHA BOILER_REPLACEMENT OF EXISTING VACUUM AND CONDENSATE PUMPS, INSTALLATION OF COMBUSTION AIR DUCTWORK AND FLUES FOR NEW DOMESTIC AND HOT WATER HEATERS.
RAVENSWOOD HOUSES (BUILDING #9), INSTALLATION OF 8 FEET HIGH CONSTRUCTION FENCE IN CONJUNCTION WITH DOB # Q00455180 TO SECURE THE STAGING AREA. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
RAVENSWOOD HOUSES (BUILDING #13), INSTALLATION OF 125 LINEAR FEET OF CONSTRUCTION FENCE IN CONJUNCTION WITH DOB # Q00455195 TO SECURE THE STAGING AREA. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
NYCHA BOILER_REMOVE AND REPLACE HOT WATER HEATERS AND WATER LINES, RECIRCULATION PUMPS, DRAINS . INSTALL NEW SUMP PUMPS AND DISCHARGE LINES. INSTALL NEW AIR INTAKES AND EXHAUST FOR WATER HEATERS.
NYCHA BOILER_REPLACEMENT OF EXISTING VACUUM AND CONDENSATE PUMPS, INSTALLATION OF COMBUSTION AIR DUCTWORK AND FLUES FOR NEW DOMESTIC AND HOT WATER HEATERS.
Replacement of existing vacuum and condensate pumps. Installation of flues for new domestic and hot water heaters.
Removal of existing concrete entry stairs, installation of new concrete entry stairs, and pads for mechanical equipment, mounting of risers to exterior facade of the building.
Replacement of existing vacuum pumps, exhaust fan, sum pumps, piping. Replacement of existing hot water tanks and piping with gas-fired water heaters. New exterior side-wall flue to the roof. Installation of new gas piping.Replacement of doors and windows
Replacement of existing vacuum pumps, exhaust fan, sum pumps, piping. Replacement of existing hot water tanks and piping with gas-fired water heaters. New exterior side-wall flue to the roof. Installation of new gas piping.Replacement of doors and windows
RAVENSWOOD HOUSES (BUILDING #12), INSTALLATION OF 50 LINEAR FEET OF CONSTRUCTION FENCE IN CONJUNCTION WITH DOB # Q00944602 TO SECURE THE STAGING AREA. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
RAVENSWOOD HOUSES - BUILDING #9, INSTALLATION OF TEMPORARY SHORING AND SUPPORT FOR EXCAVATION IN CONJUNCTION WITH DOB # Q01010451. NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
RAVENSWOOD HOUSES - BUILDING #16, INSTALLATION OF TEMPORARY SHORING AND SUPPORT FOR EXCAVATION IN CONJUNCTION WITH DOB # Q01010458. NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Replacement of existing vacuum pumps, exhaust fan, sum pumps, piping. Replacement of existing hot water tanks and piping with gas-fired water heaters. New exterior side-wall flue to the roof. Installation of new gas piping.Replacement of doors and windows
NYCHA BOILER_REPLACEMENT OF EXISTING VACUUM AND CONDENSATE PUMPS, INSTALLATION OF COMBUSTION AIR DUCTWORK AND FLUES FOR NEW DOMESTIC AND HOT WATER HEATERS.
removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
REPLACEMENT OF EXISTING VACUUM AND CONDENSATE PUMPS, INSTALLATION OF COMBUSTION AIR DUCTWORK AND FLUES FOR NEW DOMESTIC AND HOT WATER HEATERS.
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
NYCHA BOILER_REPLACEMENT OF EXISTING VACUUM AND CONDENSATE PUMPS, INSTALLATION OF COMBUSTION AIR DUCTWORK AND FLUES FOR NEW DOMESTIC AND HOT WATER HEATERS.
REPLACEMENT OF EXISTING VACUUM AND CONDENSATE PUMPS, INSTALLATION OF COMBUSTION AIR DUCTWORK AND FLUES FOR NEW DOMESTIC AND HOT WATER HEATERS.
Replacement of stairs and door of tank room. Replacement of concrete equipment pads. New exterior flue enclosure to rooftop.
RAVENSWOOD HOUSES (BUILDING #15), INSTALLATION OF 100 LINEAR FEET OF CONSTRUCTION FENCE IN CONJUNCTION WITH DOB # Q00455213 TO SECURE THE STAGING AREA. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
RAVENSWOOD HOUSES (BUILDING #14), INSTALLATION OF 100 LINEAR FEET OF CONSTRUCTION FENCE IN CONJUNCTION WITH DOB # Q00455204 TO SECURE THE STAGING AREA. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
RAVENSWOOD HOUSES (BUILDING #10), INSTALLATION OF 50 LINEAR FEET OF CONSTRUCTION FENCE IN CONJUNCTION WITH DOB # Q00455185 TO SECURE THE STAGING AREA. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
RAVENSWOOD HOUSES - BUILDING #10, INSTALLATION OF TEMPORARY SHORING AND SUPPORT FOR EXCAVATION IN CONJUNCTION WITH DOB # Q00455185, Q01010452. NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
Replacement of existing vacuum pumps, exhaust fan, sum pumps, piping. Replacement of existing hot water tanks and piping with gas-fired water heaters. New exterior side-wall flue to the roof. Installation of new gas piping.Replacement of doors and windows
RAVENSWOOD HOUSES - BUILDING #14, INSTALLATION OF TEMPORARY SHORING AND SUPPORT FOR EXCAVATION IN CONJUNCTION WITH DOB # Q01010456. NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
RAVENSWOOD HOUSES - BUILDING #13, INSTALLATION OF TEMPORARY SHORING AND SUPPORT FOR EXCAVATION IN CONJUNCTION WITH DOB # Q01010455. NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Replacement of existing vacuum pumps, exhaust fan, sum pumps, piping. Replacement of existing hot water tanks and piping with gas-fired water heaters. New exterior side-wall flue to the roof. Installation of new gas piping.Replacement of doors and windows
NYCHA BOILER_REPLACEMENT OF EXISTING VACUUM AND CONDENSATE PUMPS, INSTALLATION OF COMBUSTION AIR DUCTWORK AND FLUES FOR NEW DOMESTIC AND HOT WATER HEATERS.
Replacement of existing vacuum pumps, exhaust fan, sum pumps, piping. Replacement of existing hot water tanks and piping with gas-fired water heaters. New exterior side-wall flue to the roof. Installation of new gas piping.Replacement of doors and windows
Replacement of existing vacuum pumps, exhaust fan, sum pumps, piping. Replacement of existing hot water tanks and piping with gas-fired water heaters. New exterior side-wall flue to the roof. Installation of new gas piping.Replacement of doors and windows
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building