3327 200 STREET, Queens, NY, 11361 · New York City · 31 total events
Sprinkler & Plumbing modification on floors 1B, 3, 4, 6 & 13
HVAC and mechanical modifications on floors Basement, 1B , 3, 4, 6 & 13.
TEMPORARY HOIST RUN-BACK STRUCTURE DURING BLDG RENOVATIONS, FILED SEPARATELY. RUN-BACK STRUCTURE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. HOIST & ELEVATOR APPLICATIONS
EQUIPMENT USE: DUAL 7000 # CAPACITY PERSONNEL HOIST DURING BLDG RENOVATIONS, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY.
Interior renovation on floors 1B , 3, 4, 6 & 13.
Sprinkler & Plumbing modification on floors 1B, 3, 4, 6 & 13
Interior renovation on part of Basement 2, Basement 1, 1st 3rd, 7th, 10th, 13th floors as indicated on attached plans. There is no change to occupancy, use or egress.
Refurbishment of Boiler #4, replacement of burners for Boiler #s 1 through 4, providing all new boiler plant controls, providing a new building wide Building Automation System (BAS)
Modification of structural steel to support generator on 3rd floor roof.
Structural modification consisting of new core drill openings through existing slabs and infill of existing slab openings.
minor interior renovation throughout the building to support Emergency Generator Upgrades
Installation of new emergency Generator and associated mechanical equipment as indicated on plans.
INSTALLATION OF LIGHT DUTY SIDE WALK SHED.AS PER PLAN.
INSTALLATION OF PIPE SCAFFOLD AT 3424 KOSSUTH AVENUE, BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Installation of temporary material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of new chimney liner in existing masonry chimney on floors basement 3 roof as indicated on attached plans. There is no change in egress, use or occupancy.
Filing to modify existing suspended ceiling system to accommodate above ceiling mounted HEPA filter unit and install new low return air duct. No change to use, egress or occupancy under this application.
Filing to replace filters with enhanced electronic filtration technology, add bipolar ionization, provide UV lighting at cooling coils, and provide fan-HEPA filter modules in dental exam rooms as part of COVID Emergency Air Qualit Improvements.
INSTALLATION OF TEMP FENCE @ NORTH CENTRAL BRONX HOSPITAL FOR EMERGENCY RENOVATION (COVID-19). FENCE SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. FENCE TO BE INSTALLED ON RDWY. DOT PERMITS BY OTHERS.
INSTALLATION OF SCAFFOLDING AT THE NORTH CENTRAL BRONX HOSPITAL FOR COVID-19 WORK. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AT NORTH CENTRAL BRONX HOSPITAL FOR EMERGENCY RENOVATION (COVID-19). SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Plumbing modification on part of 10th floor (dialysis boxes) as indicated on attached plans. There is no change in egress, use or occupancy.
Modification of sprinkler systems to support emergency surge capacity renovation on floors 6, 10, 15-17
Modification of mechanical systems to support Emergency Surge Capacity renovations on floors 15-19
Mechanical modification on the 5th , 6th & 10th floor. There is no change in egress, use or occupancy.
Mechanical modification as shown on plans. There is no change in egress, use or occupancy.
Modification of sprinkler work on part of the 1st floor.
Modification of plumbing on part of the 1st floor
Modification of plumbing on 6th & 10th floor as indicated on the attached plans. There is no change in egress, use, or occupancy.
Modification of plumbing system to support emergency surge capacity renovations on floors 6, 10 & 15-18 & medical gas on floors B1 & 1-19.