33-00 NORTHERN BOULEVARD, Queens, NY · New York City · 53 total events
FILED HEREWITH FOR PLUMBING WORK AS PER PLANS.
CONSTRUCTION FENCE AT THE SIDEWALK.
ENTIRE BUILDING
FILED HEREWITH FOR SPRINKLER WORK AS PER PLANS.
INSTALLATION OF TEMPORARY WORK PLATFORM & PIPE SCAFFOLD SYSTEM AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE WORK PLATFORM & PIPE SCAFFOLD SYSTEM INSIDE THE EXISTING ELEVATOR SHAFT FROM THE 1ST FLOOR TO THE BELOW ROOF/PENTHOUSE LEVEL.
FILED HERWITH FOR ELEVATOR STRUCTURAL WORK AND DUNNAGE AS PER PLANS.
FILED HEREWITH FOR MECHANICAL WORK AS PER PLANS
FILED HEREWITH FOR INTERIOR RENOVATION AS PER PLANS.
FILED HEREWITH FOR MECHANICAL VENTILATION DESIGN AS PER PLANS, NO CHANGE TO USE, EGRESS OR OCCUPANCY.
CREATE GAS METER ROOM.
INSTALL NEW GAS SERVICE, METER AND PIPING PER PLANS.
FILING PL FOR INTERIOR TENANT FIT OUT ON THE 1ST AND 5TH FLOORS ALONG WITH INSTIALLATION OF GAS RISER AND 2 GAS GENERATORS
FILING PL FOR INTERIOR TENANT FIT OUT ON THE 6TH-8TH FLOORS
FILING SP FOR INTERIOR TENANT FIT OUT ON THE 6TH-8TH FLOORS
FILING SP FOR INTERIOR TENANT FIT OUT ON THE 1ST AND 5TH FLOORS
FILING MS FOR INTERIOR TENANT FIT OUT ON THE 1ST AND 5TH FLOORS
FILING GC FOR INTERIOR TENANT FIT OUT ON THE 6TH-8TH FLOORS
FILING MS FOR INTERIOR TENANT FIT OUT ON THE 6TH-8TH FLOORS
FILING GC FOR INTERIOR TENANT FIT OUT ON THE 1ST AND 5TH FLOORS
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
FILED HEREWITH FOR INTERIOR REMOVAL OF NON-LOAD BEARING WALLS AS PER PLAN, NO CHANGE TO USE EGRESS OR OCCUPANCY.
FILED HEREWITH TO INSTALL STEEL DUNNAGE ON ROOF AS PER PLANS, NO CHANGE TO USE, EGRESS OR OCCUPANCY
CD5 AMENDMENT FOR ADDING PLATFORM AND OUTRIGGER SYSTEM AS SHOWN ON THE PLANS.
FIRE ESCAPE
POWER OUTAGE
GARBAGE/RECYCLING STORAGE
CD5 AMENDMENT FOR ADDING PLATFORM AND OUTRIGGER SYSTEM AS SHOWN ON THE PLANS.
FILED HEREWITH FOR INTERIOR RENOVATION AS PER PLAN, NO CHANGE TO USE EGRESS OR OCCUPANCY.
Facade restoration as per plans filed herewith. No change in use, egress or occupancy.
FILED HEREWITH FOR MINOR CHANGE TO SECONDARY EGRESS ROUTE FROM STAIR J ON FIRST FLOOR OF EXISTING COMMERCIAL BUILDING.
FILED HEREWITH TO REMOVE INTERIOR NON-LOAD BEARING PARTITIONS, NO CHANGE TO USE EGRESS OR OCCUPANCY.
CD5 AMENDMENT FOR ADDING PLATFORM AND OUTRIGGER SYSTEM AS SHOWN ON THE PLANS.
FILE PLUMBING WORK WITH INSTALLATION OF PLUMBING FIXTURES AND SPRINKLER WORK OF MODIFICATION OF SPRINKLER SYSTEM IN PROPOSED DELI STORE AS PER PLAN. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
FILE PLUMBING WORK WITH INSTALLATION OF PLUMBING FIXTURES AND SPRINKLER WORK OF MODIFICATION OF SPRINKLER SYSTEM IN PROPOSED DELI STORE AS PER PLAN. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
INSTALL SUPPORTED PIPE SCAFFOLD AS SHOWN ON THE PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
GENERAL RENOVATION OF PROPOSED DELI STORE WITH NEW PARTITION, FLOOR TILES, CEILINGS, DOORS, PAINT AND MECHANICAL WORK OF NEW KITCHEN HOOD EXHAUST AND HVAC SYSTEM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
GENERAL RENOVATION OF PROPOSED DELI STORE WITH NEW PARTITION, FLOOR TILES, CEILINGS, DOORS, PAINT AND MECHANICAL WORK OF NEW KITCHEN HOOD EXHAUST AND HVAC SYSTEM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Interior renovation as shown on plans filed herewith.
Filing to decom existing antenna site. Removal of 21 antennas, 12 RRU's, equipment cabinet and platform on the roof. Initial installation approved under app 420243766, 402467086,420508837 & Q00198034.No change in use, egress, or occupancy. Carrier SPRINT
INSTALL PARAPET GUARD RAIL AT 3RD FLOOR ROOF AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
MODIFICATION OF AN EXISTING SPRINKLER SYSTEM AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUPANCY GROUP.
Installation of additional fuel-oil piping for existing fuel storage tank at the basement level; related roof work as per plans.
MECHANICAL ALTERATIONS AT 7TH FLOOR AND ROOF (DEPT. OF TRANSPORTATION) AS INDICATED ON DRAWINGS.
INSTALL INDIRECTLY ILLUMINATED ADVERTISING SIGN (CHANGEABLE COPY)
PLUMBING WORK ON PART OF CELLAR ASSOCIATED WITH INSTALLATION OF NEW SPRINKLER SUMP PUMP AS INDICATED ON DRAWINGS
Structural work on the cellar level for sprinkler booster pump installation as indicated on drawings for new sump pit.
MECHANICAL WORK TO INSTALL A LOUVER ON EXTERIOR WALL AT 1ST FLOOR AS INDICATED ON DRAWINGS.
TEMPORARY CONSTRUCTION FENCE INSTALLED AS INDICATED ON DRAWINGS
SPRINKLER ALTERATIONS ON PART OF CELLAR ASSOCIATED WITH INSTALLATION OF NEW SPRINKLER BOOSTER PUMP AS INDICATED ON DRAWINGS.
MECHANICAL ALTERATIONS ON PART OF CELLAR ASSOCIATED WITH INSTALLATION OF NEW SPRINKLER BOOSTER PUMP AS INDICATED ON DRAWINGS.