30-04 30 DRIVE, Queens, NY, 11102 · New York City · 23 total events
Installation of roof protection for protection during construction work in place as per NYC BC 3309.10
INSTALLATION OF CONSTRUCTION FENCE FOR PUBLIC PROTECTION DURING CONSTRUCTION WORK.
Herewith filing underground Plumbing document for new school building.
NB PL (Interior) Domestic HW,CW,HWR, Sanitary, Vent and Storm drainage plumbing systems for new school building. A 6 combined fire/water service, 6 dedicated sewer, 4 domestic water service will be provided.
PS 388Q - Automatic wet sprinkler system, with sprinkler booster pump. Floor control valve assemblies at each floor. Class 1 manual wet standpipe. FHV in recessed cabinets within each stairway.
PS 388Q - Filing for Temporary Standpipe during construction.
PS 388Q - Automatic wet sprinkler system, with sprinkler booster pump. Floor control valve assemblies at each floor. Class 1 manual wet standpipe. FHV in recessed cabinets within each stairway.
Herewith filing Structural document for new school building.
Heat Pump Rooftop Mounted Air Handling Units for the ventilation and conditioning for the building; split systems; ; and electric heaters for perimeter heating, space heating, and utility room.
Herewith filing Early Package Site work
Subsequent doc for Site removals, erosion and sediment controls, and excavation/grading to support the on-site plumbing.
Herewith filing New 5-story School Building Q388
Herewith filing subsequent Exterior PL document
INSTALLATION OF SIDEWALK BRIDGE FOR OVERHEAD ROTECTION OF THE PUBLIC FROM AREAS OF EXPOSURE DURING CONSTRUCTION WORK.
SOE UTILITIES IN CONJUNCTION WITH 4 STORY NEW SCHOOL BUILDING.
SOE for NB & Detention System in conjunction with new 4 story school building.
Subsequent Foundation document for new school building.
Installation of 82.215 kw solar energy system on roof. No change of occupancy, use or egress.
Herewith filing Earthwork and piles to support drainage system.
Herewith filing Earthwork and piles to support drainage system.
Herewith filing Earthwork and piles to support drainage system.
Installation of temporary fence on behalf of contractor
Filing for shoring of excavation on behalf of contractor