Plumbing work associated with Alt-CO M01233357-I1.
Interior demolition in cellar. No change in use, zoning, or egress.
REMOVE 5000 GALLON FUEL OIL TANK.
INSTALLATION OF TEMPORARY ROOF AND OVERHEAD PROTECTION PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD STAIR TOWER AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Mechanical work associated with ALT-CO M01233357-I1.
INSTALLATION OF 6000 LB DUAL PERSONNEL HOIST CAR AS PER PLANS DURING CONSTRUCTION. HOIST SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION AND USE OF TEMPORARY SUSPENDED SCAFFOLD FOR FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Removal of interior non-structural partitions on floors 1, 4, 12, 16-19. No change in use, egress, or occupancy.
Removal of interior non-structural partitions on floors 2-5, 10, 12, 14-20. No change in use, egress, or occupancy.
Removal of interior non-structural partitions on floors 1-7 and 10. No change in use, egress, or occupancy.
Removal of interior non-structural partitions on floors 11-19. No change in use, egress, or occupancy.
INSTALLATION AND USE OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
facade repair
INSTALLATION AND USE OF TEMPORARY SUSPENDED SCAFFOLD FOR FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION AND USE OF TEMPORARY SIDEWALK SHED EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Interior Non-Structural Demolition and renovations as shown on plans filed herewith. No change in use, egress or occupancy.
RENOVATION TO TENANT COMMERCIAL SPACE TO DELI AT FIRST FLOOR IN EXISTING 20-STORY BUILDING. PROPOSED WORK TO INCLUDE NEW INTERIOR PARTITIONS, FINISHES, EQUIPMENT, AND CEILING WORK. NOCHANGE IN BULK FLOOR AREA OR EGRESS UNDER THIS APPLICATION.
APPLICATION FILED TO INSTALL NEW SPRINKLER HEADS AND PIPING ON THEEXISTING SPRINKLER SYSTEM FOR THE COMMERCIAL SPACE. NO CHANGEIN BULK, FLOOR AREA, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Propose enclosure of convince stair opening. No change to use, egress or occupancy.
Modification of an existing Verizon site on the roof. Replace (5) antennas, (12) RRHS, Install (1) antenna. Install (2) new microwave antennas.
New Dish installation on roof. Installation of 3 new antenna sectors, 6 RRH units, 1 GPS unit, and 1 cabinet. Related service connection in cellar.. No change in use, egress, or occupancy.
APPLICATION FILED TO INSTALL NEW TYPE I KITCHEN HOOD ON 1ST FLOOR, EXHAUST FAN, MAKE-UP AIR UNIT, AND DUCTWORK AS PER PLANS. FIRE SUPPRESSION SYSTEM FILED SEPARATELY WITH THE FDNY. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
APPLICATION FILED TO INSTALL NEW PLUMBING FIXTURES AT 1ST FLOOR COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Propose to install condensers on the roof. No change to use, egress or occupancy.
Propose to perform sprinkler work. No change to use, egress or occupancy.
Propose to file for AC unit replacement. No change to use, egress or occupancy.
Propose to remove interior partitions. No change to use, egress or occupancy.
Propose to install sprinkler heads. No change to use, egress or occupancy.