Suspended Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy
MAILBOX
APARTMENT ONLY
COOKING GAS
WATER SUPPLY
INSTALLATION OF CONSTRUCTION PLYWOOD FENCE AS PER PLANS. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OR OCCUPANCY,
INSTALLATION OF PIPE SCAFFOLDING AND NEEDLE BEAM AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF 6,000LB DUAL PERSONNEL/MATERIAL HOIST CARS AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Suspended Hanging Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy
Installation of new sprinkler heads, associated piping & standpipe system AS PER PLANS FILED HEREWITH. APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 420665667
Installation of new sprinkler heads, associated piping & standpipe system AS PER PLANS FILED HEREWITH. APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 420665667
New installation of (Temp Standpipe) in conjunction to the new building application filed under #420665667 as per plans filed herewith
INSTALL ONE (1) 550 GALLON MAIN FUEL OIL STORAGE TANK IN SUB-CELLAR 2 AND ONE (1) 90 GALLON DAY TANK TO SERVE EMERGENCY DIESEL GENERATOR ON FOURTH FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
INSTALLATION OF 300 psf SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE INUSE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
CONSTRUCCTION OF NEW CAST-IN-PLACE CONTRETE 28-STORY RESIDENTIALTOWER. MAIN STRUCTURAL GRAVITY SYSTEM CONSISTS OF CONCRETE FLAT SLAB SUPPORTED OFF CONCRETE COLUMNS. MAIN STRUCTURAL LATERAL SYSTEM CONSISTS OF CONCRETE SHEAR WALL CORE WITH LINK BEAMS.
Application for the installation and use of temporary mini crane filed herein. No change in egress, use, and occupancy.
Application for the installation and use of temporary mini crane filed herein. No change in egress, use, and occupancy.
INSTALLATION AND USE OF TEMPORARY MINI CRANE CLIMBER AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Installing the plumbing systems (sanitary, waste, storm) AS PER PLANS FILED HEREWITH. APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 420665667.
INSTALLTION AND USE OF TEMPORARY CLIMBING PLATFORMS AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.