21-51 34 AVENUE, Queens, NY, 11106 · New York City · 75 total events
Installation of 77.935 kw solar energy system on roof. No change of occupancy, use or egress
Installation of 43.6 kw solar energy system on roof. No change of occupancy, use or egress
Installation of 38.695 kw solar energy system on roof. no change of occupancy, use or egress
Installation of 41.42 kw solar energy system on roof. No change of occupancy, use or egress
Installation of 42.51 kw solar energy system on roof. No change of occupancy, use or egress.
Installation of 81.75 kw solar energy system on roof. No change of occupancy, use or egress
Installation of 83.385 kw solar energy system on roof. No change of occupancy, use or egress.
Installation of 70.85 kw solar energy system on roof. No change of occupancy, use or egress.
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
NYCHA BOILER_INSTALL NEW TWO NATURAL GAS METERS WITH GAS REGULATORS SET UP FOR NEW WATER HEATERS IN BUILDING 1 THAT FILED UNDER SEPARATE APPLICATION (DOB NOW JOB# Q00449518-S2). CONNECT NEW METERS TO EXISTING HIGH PRESSURE SERVICE WITHIN EXISTING GAS METE
PLEASE NOTE: 7 boilers were initially approved as part of Boiler Job Q00449518-S5, but only 1 unique boiler ID was generated. We are now submitting the other 6 boilers as part of subsequent filing to generate 6 more boiler IDs. MS filing was also approved
REMOVE AND REPLACE HOT WATER HEATERS AND WATER LINES, RECIRCULATION PUMPS, DRAINS . INSTALL NEW SUMP PUMPS AND DISCHARGE LINES. INSTALL NEW AIR INTAKES AND EXHAUST FOR WATER HEATERS.
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
REMOVE AND REPLACE OR PROVIDE NEW SUMP PUMPS AND DISCHARGE LINES.
RAVENSWOOD HOUSES - BUILDING No. 1, INSTALLATION OF TEMPORARY GAS PIPING IN THE BOILER ROOM TO CONNECT 4 MOBILE BOILER TRAILERS TO PROVIDE HEAT DURING THE HEATING SEASON IN CONJUNCTION WITH DOB # Q00449518. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
REMOVE AND REPLACE HOT WATER HEATERS AND WATER LINES, RECIRCULATION PUMPS, DRAINS . INSTALL NEW SUMP PUMPS AND DISCHARGE LINES. INSTALL NEW AIR INTAKES AND EXHAUST FOR WATER HEATERS.
NYCHA BOILER_REMOVE AND REPLACE HOT WATER HEATERS AND WATER LINES, RECIRCULATION PUMPS, DRAINS . INSTALL NEW SUMP PUMPS AND DISCHARGE LINES. INSTALL NEW AIR INTAKES AND EXHAUST FOR WATER HEATERS.
Replacement of existing condensate pumps and associated piping.
REPLACEMENT OF EXISTING VACUUM AND CONDENSATE PUMPS, INSTALLATION OF COMBUSTION AIR DUCT WORK AND FLUES FOR NEW DOMESTIC AND HOT WATER HEATERS.
RAVENSWOOD HOUSES (BUILDING #02), INSTALLATION OF 8 FEET HIGH CONSTRUCTION FENCE IN CONJUNCTION WITH DOB # Q00450564 TO SECURE THE STAGING AREA. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Replacement of existing condensate pumps and associated piping.
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
REPLACEMENT OF EXISTING VACUUM AND CONDENSATE PUMPS, INSTALLATION OF COMBUSTION AIR DUCTWORK AND FLUES FOR NEW DOMESTIC AND HOT WATER HEATERS.
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
NYCHA BOILER_REPLACEMENT OF EXISTING VACUUM AND CONDENSATE PUMPS, INSTALLATION OF COMBUSTION AIR DUCTWORK AND FLUES FOR NEW DOMESTIC AND HOT WATER HEATERS.
REPLACEMENT STAIRS AND DOORS OF BOILER PLANT AND TANK/PUMP ROOMS IN KIND WITH EXISTING. REPLACEMENT CONCRETE EQUIPMENT PADS.
NYCHA BOILER_REPLACEMENT OF EXISTING VACUUM AND CONDENSATE PUMPS, INSTALLATION OF COMBUSTION AIR DUCTWORK AND FLUES FOR NEW DOMESTIC AND HOT WATER HEATERS.
REPLACEMENT STAIRS AND DOORS OF BOILER PLANT AND TANK/PUMP ROOMS IN KIND WITH EXISTING. REPLACEMENT CONCRETE EQUIPMENT PADS.
NYCHA BOILER_Removal and replacement of existing condensate pump concrete pads
REPLACEMENT STAIRS AND DOORS OF BOILER PLANT AND TANK/PUMP ROOMS IN KIND WITH EXISTING. REPLACEMENT CONCRETE EQUIPMENT PADS. NEW EXTERIOR FLUE ENCLOSURE TO ROOFTOP.
REPLACEMENT STAIRS AND DOORS OF BOILER PLANT AND TANK/PUMP ROOMS IN KIND WITH EXISTING. REPLACEMENT CONCRETE EQUIPMENT PADS. NEW EXTERIOR FLUE ENCLOSURE TO ROOF TOP.
REPLACEMENT OF EXISTING VACUUM AND CONDENSATE PUMPS, INSTALLATION OF COMBUSTION AIR DUCTWORK AND FLUES FOR NEW DOMESTIC AND HOT WATER HEATERS.
REPLACEMENT OF EXISTING VACUUM AND CONDENSATE PUMPS, INSTALLATION OF COMBUSTION AIR DUCTWORK AND FLUES FOR NEW DOMESTIC AND HOT WATER HEATERS.
installation of new steel access platforms for new boilers, entry platform and stairs from storage room to boiler room, new concrete pads for mech. equip., temporary shoring of ceiling in coal storage
Temporary shoring scheme to help the roof structure support the loads of the temporary boilers for the duration of the boilers installation. No demolishing or altering the existing structure under this filing.
REPLACEMENT STAIRS AND DOORS OF BOILER PLANT AND TANK/PUMP ROOMS IN KIND WITH EXISTING. REPLACEMENT CONCRETE EQUIPMENT PADS.
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
REPLACEMENT STAIRS AND DOORS OF BOILER PLANT AND TANK/PUMP ROOMS IN KIND WITH EXISTING. REPLACEMENT CONCRETE EQUIPMENT PADS.
removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
RAVENSWOOD HOUSES (BUILDING #8), INSTALLATION OF +/- 180 LINEAR FEET OF CONSTRUCTION FENCE IN CONJUNCTION TO SECURE THE STAGING AREA. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALL A 56 1/2'x34'x17' DEEP BRACED INTERLOCKING STEEL SHEET PILE SUPPORT OF EXCAVATION SYSTEM TO FACILITATE THE REMOVAL OF THE EXISTING UNDERGROUND FUEL STORAGE TANKS AT THE RAVENSWOOD HOUSES
REPLACEMENT OF EXISTING VACUUM AND CONDENSATE PUMPS, INSTALLATION OF COMBUSTION AIR DUCTWORK AND FLUES FOR NEW DOMESTIC AND HOT WATER HEATERS.
RAVENSWOOD HOUSES (BUILDING #1), INSTALLATION OF 8 FEET HIGH CONSTRUCTION FENCE TO SECURE THE STAGING AREA. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
REPLACEMENT OF EXISTING VACUUM AND CONDENSATE PUMPS, INSTALLATION OF COMBUSTION AIR DUCTWORK AND FLUES FOR NEW DOMESTIC AND HOT WATER HEATERS.
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
RAVENSWOOD HOUSES (BUILDING #05), INSTALLATION OF 8 FEET HIGH CONSTRUCTION FENCE IN CONJUNCTION WITH DOB # Q00454977 TO SECURE THE STAGING AREA. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
RAVENSWOOD HOUSES (BUILDING #03), INSTALLATION OF 8 FEET HIGH CONSTRUCTION FENCE IN CONJUNCTION WITH DOB # Q00454931 TO SECURE THE STAGING AREA. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.