165-15 88 AVENUE, QUEENS, NY 11432 · New York City · 17 total events
Installation of sidewalk shed for public protection during construction work
Q497- INSTALLATION OF GENERATOR BELLY TANK.
Q497 ; Boiler : 2 units of Package Type Boilers with Burners and associated piping
Q497 / SSDS / Sub Slab Depressurization System & Gas Vapor Barrier including Pits, Sub Slab Vent Pipe, Condensate Drains, Inverts, Manifolds, Riser Piping, Monitoring Point, Gas Permeable Aggregate, Geotextile, Geomembrane Application of Gas Vapor Barrier
Q497 : Mechanical Systems Consisting of Air handling Units, Fans, Duct Silencer, Air Cooled Chiller, Hot Water Unit Heater, Hot Glycol Unit Heater, Plate & Frame Unit Exchanger, Hot Water Fin Tube heater, Air Separator, Condensing Units, Ductworks etc...
Q497 : Underground and Interior Plumbing Consisting of WC's, Urinals, Sinks ,Lav's, Drinking Fountain & Bubblers, Shower Stalls, Floor Drains, Hot Water Heaters, Acid Neutralizing Tanks, Grease Traps, Mop Sinks, Gas Booster Pumps, Roof Drains, RPZ's,
Q497:Installation of the Structural Framing of the New 5 Story Educational Structure consisting of Reinforced Steel Beams, Reinforced Steel Columns, Steel Beams, Girders, Steel Joists, Braces, Steel Plates & Stiffeners ,Bearing & Non-Bearing walls,
SOE FOR DETENTION SYSTEM IN CONJUNCTION WITH 5 STORY NEW SCHOOL BUILDING.
Q429 : Site Plumbing : 1 Detention Tank with 8 Modules, 4 Trench Drains, 8 Storm and 6 Domestic & Sprinkler Water Service along Merrick Blvd., 4 Water Service & 6 Storm Sewer along 88th Ave., 4 LP Gas Service along 165th Street and asso. piping
Q497 : Emergency Generator : Installation of a Packaged Type Emergency Generator with Built - in 275 gallon tank on the 4th floor
CONSTRUCTION FENCE IN CONJUNCTION WITH NEW SCHOOL BUILDING AND RELATED SOE.
INSTALLATION OF A COMBINATION SPRINKLER/STANDPIPE IN CONJUNCTION WITH NB.
INSTALLATION OF A COMBINATION SPRINKLER/STANDPIPE IN CONJUNCTION WITH NB.
SUPPORT OF EXCAVATION IN CONJUNCTION WITH 5 STORY NEW BUILDING.
Q497 - Construction of a new 5 Story Educational School building including lighting energy analysis.
TEMPORARY PLACEMENT OF TELESCOPIC HANDLER TO HOIST AND LAND FORMWORK, REBAR, AND OTHER MATERIALS.
Q497:Installation of the Foundation for the new 5 Story Educational Structure with cellar consisting of Reinforced Grade Beams, Reinforced Slab Footings, Reinforced Slab on Ground & On Grade, Reinforced Retaining Wall & Step Footing, Buttress & Column Ftg