Demo.(2)Air Conditioning Units, Ductwork, Exterior Louvers&Toilet Exhaust Grilles, Install Air Conditioning Unit, Controls, Associated Ducts, Exterior Louvers&Dampers, Condensate Pump&Piping, Toilet Exhaust Fans, Ducts&Dampers & Steam Radiators on 11th FL
Remove & Install Plumbing Fixtures & Piping (Replace (2) Restrooms, Renovate (2) Restrooms, Install Pantry), Install Non-Gas Water Heaters & Piping and Modifications to Existing Sprinkler System on 11th Floor
Demo.Walls, Doors, Millwork, Flooring, Replace(2)Restrooms,Renovate(2)Restrooms,New Ceiling&Flooring in Restrooms, Install Pantry&Millwork,Furr Entire Ceiling Slab With Gyp.Bd.,Paint Throughout, Finish Floor Slab on 11 Fl. No Change to Occup,Use or Egress
Minor Demolition & Construction of Partitions, Doors and Millwork, Install Wall Mounted Shelving Unit Within New Showroom & Paint Various Wall Surfaces on Part of 13th Floor (Floor 12A). No Change to Occupancy, Use or Egress is Proposed
Repair/Replace Exist. Damaged Bricks&Cracks,Repoint Bricks,Replace Steel Lintel&Waterproof Membrane in Rear Exterior Wall at 1st Fl.&Brick Parapet Above on Low Roof,Install Coping Cover&Relocate Metal Fence on Parapet. No Change to Occupancy,Use or Egress
Remove & Install Plumbing Fixtures & Piping and Modify Existing Sprinkler System.
Application filed for the sprinkler renovations of existing 6th-floor space as shown on plans filed herewith. No change to use, egress, or occupancy
Application filed for the mechanical renovations of existing 6th-floor space as shown on plans filed herewith. No change to use, egress, or occupancy
Remove & Install Plumbing Fixtures & Piping (Replace (2) Restrooms, Renovate (2) Restrooms, Install Pantry), Install Non-Gas Water Heaters & Piping and Modifications to Existing Sprinkler System on 11th Floor
Application filed for the interior renovation of existing 6th-floor space as shown on plans filed herewith. No change to use, egress, or occupancy.
FACADE RESTORATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
REFILE FOR REPLACEMENT BOILER #2 ORIGIONALLY FILED UNDERM00362865. FILE FOR CHANGE FROM #4 TO #2 OIL.
REINSTALL EXISTING GAS/OIL BURNER
Demolition of Existing Air Conditioning Units, Ductwork & (1) Exterior Louver, Install Air Conditioning Unit, Condensate Pump & Piping, Interior & Exterior Ductwork, VAV Boxes & (1) Exterior Louver on Part of 8th Floor
Remove & Install Plumbing Fixtures & Piping and Modify Existing Sprinkler System.
Replace Existing Gas Boiler, Existing Burner to be Reused.
INSTALLATION OF SIDEWALK SHED AS SHOWN ON DRAWINGS. THERE WILL BE NO CHANGE IN USE EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTTER 33 OF 2014 B.C