REMOVE SELECT INTERIOR NON-BEARING PARTITIONS, DOOR, AND FINISHES WITHIN EXISTING LAUNDRY AND HALF-BATH AREA. CONSTRUCT NEW NON-LOAD-BEARING PARTITIONS. INSTALL NEW WALL-MOUNTED CABINETS AND CUSTOM SHELVING IN LAUNDRY AREA.
install new washer and gas dryer. No change to use egress or occupancy
NEW WOODEN DECK AT FIRST FLOOR LEVEL AT REAR (NORTHERN) SIDE OF BUILDING. NO CHANGE TOUSE, EGRESS OR OCCUPANCY.
MINOR INTERIOR ALTERATION. NEW SPLIT SYSTEM HVAC, RENOVATE KITCHEN AND BATHROOMS,PARTITIONS, KITCHEN CABINETS, DOORS, TRIM AND FINISHES AS PER PLAN. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
INTERIOR RENOVATION AT SECOND FLOOR. REPLACE ALL KITCHEN FIXTURES ON EXISTING ROUGHING. REPLACE TOILET AND LAVATORY ON EXISTING ROUGHING. REMOVE BATHTUB, ADD SHOWER WITH ASSOCIATED PIPING.
INTERIOR RENOVATION OF SECOND FLOOR APT. NEW FLOORING, TRIM, CABINETRY AND FINISHES AT BATHROOM AND KITCHEN. NEW THRU-WALL A/C UNIT. PLUMBING FILED UNDER SEPARATE APPLICATION. NO CHANGE TO THE BULK, USE, EGRESS, AND OCCUPANCY UNDER THIS APPLICATION
INTERIOR KITCHEN AND BATHROOM RENOVATION. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
INTERIOR KITCHEN AND BATHROOM RENOVATION; RE-PAINT WALLS & CEILINGS AS PER REQUIRED. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
To create a toilet and a laundry area at first floor level as illustrate on plans. All work as per plans.
to create a toilet room. no change in use, egress or occupancy
REPLACE PLUMBING FIXTURES ON EXISTING ROUGHING AT KITCHEN AND BATHS. NEW LAUNDRY EQUIPMENT AND PIPING. WORK AT SECOND FLOOR APARTMENT. FILED IN CONJUNCTION WITH GC APPLICATION Q01137087-I1. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
MINOR INTERIOR ALTERATION. NEW SPLIT SYSTEM HVAC, RENOVATE KITCHEN AND BATHROOMS,PARTITIONS, KITCHEN CABINETS, DOORS, TRIM AND FINISHES AS PER PLAN. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
ERECT WOOD DECK IN OPEN SPACE AT REAR OF COOP APARTMENT
INSTALLATION OF MINI-SPLIT UNITS AND CONDENSING UNIT AS PER PLANS. NO CHANGE TO THE BULK, USE, EGRESS, AND OCCUPANCY UNDER THIS APPLICATION.
ERECTION OF LUMBER TEMP. SHORING AT ANTICPATED AREA OF WORK FROM THE BASE GARAGE UP TO CEILING OF 1ST FL. (LL02 FRAMING). WORK ALSO INCL. REPLACEMENT OF PREV. INSTALLED LUMBER HEADERS & POSTS WITH PSL + LVL COMPONENTS W/ASSOCIATED STL BASE CONNECTIONS
INTERIOR ALTERATION. NEW PARTITIONS AS PER PLANS. NEW SPLIT SYSTEM HVAC, KITCHEN CABINETS, DOORS, TRIM AND FINISHES THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
FILING TO LEGALIZE AND ADDRESS EMERGENCY WORK ORDER OF INTERIOR FRAMING AND WOODEN STRUCTURAL HEADERS ANO POSTS WITHIN FIRST FLOOR UNIT, KITCHEN ANO LIVING ROOM AREA. NEW FINISHES AS PER PLANS. FILED TO ADDRESS DOB VIOL.TIONS #S CEU40101PW AND CEU40702PW
INTERIOR ALTERATION. NEW PARTITIONS AS PER PLANS. NEW SPLIT SYSTEM HVAC, KITCHEN CABINETS, DOORS, TRIM AND FINISHES THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
FILING FOR PLUMBING IN CONJUNCTION WITH GC Q00926786
APPLICATION FILED TO INSTALL NEW WASHER AND GAS DRYER, REPLACE PLUMBING FIXTURES ON EXISTING ROUGHING, AND RELOCATE GAS RANGE AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
INTERIOR KITCHEN RENOVATION INCLUDING TWO (2) NEW PIECES IN BATHROOM AND STACKED ELECTRIC WASHER AND DRYER ON THE FIRST FLOOR AND REPLACE FIXTURES ON THE SECOND FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY IS INVOLVED.
INTERIOR KITCHEN RENOVATION ON THE FIRST FLOOR AND BATHROOM ON THE FIRST & SECOND FOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY IS INVOLVED.
INTERIOR ALTERATION. NEW PARTITIONS, DOORS, TRIM AND FINISHES AT KITCHEN ON FIRST FLOOR AND CLOSETS & BATHROOM ON SECOND FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
REPLACEMENT OF PLUMBING FIXTURES ON FIRST AND SECOND FLOOR IN CONJUNCTION WITH GC Q00687917
Reconnect gas line to existing gas-fired clothes dryer.
ELECTRIC/GAS RANGE