149-01 33 AVENUE, Queens, NY, 11354 · New York City · 9 total events
Installation of suspended scaffold for facade inspection /repair SR21/1350
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE, NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE, NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. SIDEWALK SHED LIVE LOAD 300 PSF ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Installation of new antennas & RRUs, replacement of existing antennas, RRUs and equipment cabinets. All work is in compliance with TPPN 5/98 & BB 2021-011. No change to use, egress or occupancy.
INSTALLATION OF SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. SIDEWALK SHED LIVE LOAD 300 PSF ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY.
REPLACEMENT OF AIR CONDITIONING UNITS ON THE MEZZANINE MER. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY
AT&T - Replacement of existing telecommunication antennas on facade. Replacement of existing RRH units in the existing equipment room in cellar. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.