133-24 36 ROAD, Queens, NY, 11354 · New York City · 23 total events
CONSTRUCT NEW 16-STORY MIXED USE BUILDING: COMMERCIAL (RETAIL, HOTEL), COMMUNIY FACILITY, & RESIDENTIAL USES. OBTAIN NEW C OF O.
INSTALLATION OF PLUMBING SYSTEMS INCLUDING SEWER, STORM, DOMESTICWATER, AND GAS PIPING SYSTEMSI. NSTALLATION OF FIRE PROTECTION SYSTEMS INCL. STANDPIPE SYSTEM,SPRINKLER HEADS, PIPING, VALVES, AND BACKFLOW PREVENTION DEVICES.
INSTALLATION OF PLUMBING SYSTEMS INCLUDING SEWER, STORM, DOMESTICWATER, AND GAS PIPING SYSTEMSI. NSTALLATION OF FIRE PROTECTION SYSTEMS INCL. STANDPIPE SYSTEM,SPRINKLER HEADS, PIPING, VALVES, AND BACKFLOW PREVENTION DEVICES.
INSTALLATION OF MECHANICAL HVAC SYSTEMS INCLUDING HEATING & COOLING EQUIPMENT, VENTILATION DUCT WORK & FANS, AND MECHANICAL PIPING.
Propose installation of fuel storage tank for emergency generator filed in conjunction with NB # Q00523537-I1.
INSTALL (3) 20' LONG NEW CURB CUT AND (1) 12' LONG NEW CURB CUT FOR A 16-STORY MIX-USED NEW BUILDING.
INSTALLATION OF PLUMBING SYSTEMS INCLUDING SEWER, STORM, DOMESTICWATER, AND GAS PIPING SYSTEMSI. NSTALLATION OF FIRE PROTECTION SYSTEMS INCL. STANDPIPE SYSTEM,SPRINKLER HEADS, PIPING, VALVES, AND BACKFLOW PREVENTION DEVICES.
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Installation of temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of a temporary heavy-duty sidewalk shed, overhead protection and roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
PROPOSE TEMPORARY STANDPIPE SCOPE OF WORK FILED IN CONJUNCTION WITH NB # Q00523537-I1.
INSTALLATION OF MATERIAL HOISTS. HOISTS SHALL COMPLY WITH THE 2022 BLDG CODES, CH #33. NO CHANGE IN USE, OCC OR EGRESS UNDER THIS APP ELEV APPL FILED SEP
INSTALLATION AND USE OF TEMPORARY MINI CRANE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLDS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
PROPOSE STRUCTURAL SCOPE OF WORK FOR 16 STORY NB. STRUCTURE WILL CONSIST OF CAST IN PLACE CONCRETE SLABB AND COLUMNS. LATERAL SYSTEM WILL CONSIST OF CONCRETE SLAB DIAPHRAMS WITH ORIDANARY REINFORCED CIP SHEAR WALLS IN CONJUNCTION WITH NB # Q00523537-I1
INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
INSTALLATION OF 6,000 LBS GJJ SC270G SINGLE CAR PERSONAL/MATERIAL HOIST AS PER PLAN IN CONJUNCTION WITH GC: Q00523537-I1. WORK SHALL COMPLY WITH 2014 BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. INSTALLATION AND TESTS AS PER ANSI A 10.4-1981.A
INSTALLATION OF 6,000 LBS GJJ SC270G SINGLE CAR PERSONAL/MATERIAL HOIST AS PER PLAN IN CONJUNCTION WITH GC: Q00523537-I1. WORK SHALL COMPLY WITH 2014 BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. INSTALLATION AND TESTS AS PER ANSI A 10.4-1981. B
Subsequent filing for Support of Excavation work in conjunction with NB # Q00523537-I1.
PROPOSE FOUNDATION SCOPE OF WORK FILED IN CONJUNCTION WITH NB APPLICATION # Q00523537-I1.
INSTALL TEMPORARY CONSTRUCTION FENCE
PROPOSED TO CAP AND REMOVE SPRINKLER SYSTEM ,NO CHANGE TO USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
PROPOSED INSTALLATION OF HEAVY-DUTY SIDEWALK SHED & PIPE SCAFFOLDING WITH NETTING AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.