Structural modifications (Early Demo- Package 2) as per plans. No change to use, egress or occupancy.
Slab infill to existing floor opening (Early Demo Package 2) as per plans. No change to the existing building envelope, use, egress or occupancy.
HVAC removals (Early Demo- Package 1) as per plans. No change to use, egress or occupancy.
Selective demolition of interior non-bearing partitions, related finishes, removal and reinstallation of column fireproofing and tenant layouts (Early Demo Package 1) as per plans. No change to use, egress or occupancy.
Modifications to the existing sprinkler systems (Phase 1- Soft Demo) as per plans. No change to use, egress or occupancy.
Removal of existing sprinkler systems with installation of temporary loops on the 14th through 22nd floors (Phase 2- Soft Demo) as per plans. No change to use, egress or occupancy.
Removal of existing sprinkler systems with installation of temporary loops on the 2nd through 13th floors (Phase 3- Soft Demo) as per plans. No change to use, egress or occupancy.
Removal of existing plumbing fixtures and associated piping on the 2nd through 13th floors (Phase 3- Soft Demo) as per plans. No change to use, egress or occupancy.
Removal of existing plumbing fixtures and associated piping on the 14th through 22nd floors (Phase 2- Soft Demo) as per plans. No change to use, egress or occupancy.
Removal and disposal of interior partitions, doors, ceilings and finishes on the 2nd through 13th floors (Phase 3- Soft Demo) as per plans. No change to use, egress or occupancy.
HVAC removals on the 2nd through 13th floors (Phase 3- Soft Demo) as per plans. No change to use, egress or occupancy.
HVAC removals on the 14th through 22nd floors (Phase 2- Soft Demo) as per plans. No change to use, egress or occupancy.
Removal and disposal of interior partitions, doors, ceilings and finishes on the 14th through 22nd floors (Phase 2- Soft Demo) as per plans. No change to use, egress or occupancy.
HVAC removals (Phase 1- Soft Demo) as per plans. No change to use, egress or occupancy.
Removal of existing plumbing fixtures and associated piping (Phase 1- Soft Demo) as per plans. No change to use, egress or occupancy.
Removal and disposal of interior partitions, doors, ceilings and finishes (Phase 1- Soft Demo) as per plans. No change to use, egress or occupancy.
ERECT NON-ILLUMINATED ACCESSORY BUSINESS WALL SIGN; COPY READING BANK OF AMERICA WITH FLAG LOGO
ERECT NON-ILLUMINATED ACCESSORY BUSINESS WALL SIGN; COPY READING BANK OF AMERICA WITH FLAG LOGO
LIGHTING UPGRADE FOR BANK OF AMERICA. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
BANK RENOVATION (BANK OF AMERICA) WORK TO INCLUDE STRUCTURAL MODIFICATIONS AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
BANK RENOVATION (BANK OF AMERICA) WORK TO INCLUDE PARTITION, DOOR, CEILING AND ENTRANCE DOOR MODIFICATIONS AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Window replacement and facade modifications as per plans. No change to use, egress or occupancy.
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
BANK RENOVATION (BANK OF AMERICA) WORK TO INCLUDE MODIFICATIONS TO EXISTING SPRINKLER SYSTEM AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
(BANK OF AMERICA) MECHANICAL WORK TO INCLUDE INSTALLATION OF AC UNITS, ELECTRIC DUCT HEATER AND ASSOCIATED DUCT AND PIPING AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Modifications to the existing sprinkler system on the 23rd floor (Suite 2300) as per plans. No change to use, egress or occupancy.
Modifications to the existing plumbing system on the 23rd floor (Suite 2300) as per plans. No change to use, egress or occupancy.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 23rd floor (Suite 2300) as per plans. No change to use, egress or occupancy.
Modifications to the existing HVAC system on the 23rd floor (Suite 2300) as per plans. No change to use, egress or occupancy.
Modifications to the existing HVAC system on the 14th, 20th and 33rd floors as per plans. No change to use, egress or occupancy.
Removal and disposal of interior partitions, doors, suspended ceilings and finishes with modifications to the core restrooms on the 14th, 20th and 33rd floors as per plans. No change to use, egress or occupancy.
Modifications to the existing HVAC system on the 1st floor (Reside Health) as per plans. No change to use, egress or occupancy.
Removal of existing plumbing fixtures and associated piping (Amenity Space Demo) as per plans. No change to use, egress or occupancy.
Modifications to the existing sprinkler system (Amenity Space Demo) as per plans. No change to use, egress or occupancy.
Structural modification (Amenity Space Demo) as per plans. No change to use, egress or occupancy.
Removal of existing ceilings, walls and floor finishes (Amenity Space Demo) as per plans. No change to use, egress or occupancy.
HVAC removals (Amenity Space Demo) as per plans. No change to use, egress or occupancy.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Removal of existing sprinkler heads with installation of a temporary loop on the 1st floor (Retail B) as per plans. No change to use, egress or occupancy.
Removal of existing plumbing fixtures and associated piping on the 1st floor (Retail B) as per plans. No change to use, egress or occupancy.
Modifications to the existing sprinkler system on the 1st floor (Ten Thousands Cafe) as per plans. No change to use, egress or occupancy.
HVAC removals on the 1st floor (Retail B) as per plans. No change to use, egress or occupancy.
Removal and disposal of interior partitions, doors, suspended ceilings and finishes on the 1st floor (Retail B) as per plans. No change to use, egress or occupancy.
Proposed to install non-illuminated accessory business sign. Wording 10000/ TENTHOUSAND COFFEE.
Modifications to the existing sprinkler systems on the 14th, 20th and 33rd floor as per plans. No change to use, egress or occupancy.
Stair removal and infill on the 14th floor as per plans. No change to use, egress or occupancy.
Modifications to the existing plumbing system on the 14th, 20th and 33rd floors as per plans. No change to use, egress or occupancy.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 1st floor (Reside Health) as per plans. No change to use, egress or occupancy.
Modifications to the existing standpipe system on floors 32 through 34 (LL26 Upgrade) as per plans. No change to use, egress or occupancy.