TEMPORARY SYSTEM SCAFFOLD AS PER DRAWINGS. SYSTEM SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
ADJACENT PROPERTY (BLOCK 1823 LOT 60) OVERHEAD PROTECTION AS PER DRAWINGS. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
FILING HEREWITH FOR SUPERSTRUCTURE AS PER PLANS.
FILING HEREWITH INSTALLATION OF PLUMBING FIXTURES AS PER PLANS.
INSTALLATION OF ACCESS SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
FILING HEREWITH FOR EGRESS ONLY FOR FIVE-STORY STADIUM NEW BUILDING AS PER PLANS.
FILING HEREWITH NEW APPROXIMATELY 25,000 SEAT OPEN AIR MIXED-USE SOCCER STADIUM PRIMARILY FOR MAJOR LEAGUE SOCCER AS PER PLANS.
INSTALLATION OF NEW WET AND DRY SPRINKLER SYSTEMS AND WET, AUTOMATIC AND DRY, AUTOMATIC STANDPIPE SYSTEMS FOR MIXED-USE SOCCER STADIUM AS PER PLANS. FILED IN CONJUNCTION WITH NB# Q01002920 AND MPP# 000000150.
INSTALLATION OF NEW WET AND DRY SPRINKLER SYSTEMS AND WET, AUTOMATIC AND DRY, AUTOMATIC STANDPIPE SYSTEMS FOR MIXED-USE SOCCER STADIUM AS PER PLANS. FILED IN CONJUNCTION WITH NB# Q01002920 AND MPP# 000000150.
EQUIPMENT USE: DUAL 6610 # CAPACITY PERSONNEL HOIST DURING NB CONST, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
TEMPORARY HOIST RUN-BACK STRUCT. DURING NEW BLDG CON. FILED SEPARATELY. HOIST RUN-BACK STRUCT SHALL COMPLY WITH CHAPTER #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. HOIST & ELEVATOR APPLICATIONS FILED SEPARATELY
FILING HEREWITH FOR INSTALLATION OF MECHANICAL SYSTEMS AS PER PLANS.
SUPPORT OF EXCAVATION FOR SITE REMEDIATION PROJECT ON VACANT LAND.
FILING HEREWITH FOR TEMPORARY MANUAL DRY STANDPIPE SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB# Q01002920 AND MPP# 000000150.
FILING HEREWITH SUPPORT OF EXCAVATION RELATED TO OPEN SPACE PROJECT ASSOCIATED WITH NYCFC STADIUM DEVELOPMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB# Q01002920 (MPP#150).
FILING HEREWITH FOR UNDERGROUND PLUMBING RELATED TO OPEN SPACE PROJECT ASSOCIATED WITH NYCFC STADIUM DEVELOPMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB# Q01002920 (MPP#150).
FILING HEREWITH SLABS, STEPS, RAMPS, PLANTER WALLS AND PILE CAPS RELATED RELATED TO OPEN SPACE PROJECT ASSOCIATED WITH NYCFC STADIUM DEVELOPMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB# Q01002920 (MPP#150).
FILING HEREWITH FOR LANDSCAPING RELATED TO OPEN SPACE PROJECT ASSOCIATED WITH NYCFC STADIUM DEVELOPMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB# Q01002920 (MPP#150).
FILING HEREWITH SUPPORT OF EXCAVATION FOR UNDERGROUND PLUMBING AS PER PLANS.
FILING HEREWITH FOR TEMPORARY ENCLOSURE FOR PROTECTION OF SWITCHGEAR EQUIPMENT AS PER PLANS.
FILING HEREWITH FOR SUB-MEMBRANE DEPRESSURIZATION SYSTEM AS PER PLANS.
FILING HEREWITH FOR NEW EXTERIOR UNDERGROUND PLUMBING SYSTEM FOR NEW SOCCER STADIUM AS PER PLANS FILED HEREWITH.
FILING HEREWITH FOR UNDERGROUND PLUMBING ON STADIUM INTERIOR AS PER PLANS.
FILING HEREWITH FOR UNDERGROUND PLUMBING EXTERIOR TO STADIUM AS PER PLANS.
FILING HEREWITH FOR UNDERGROUND PILES FOR FOUNDATION/EARTHWORK AS PER PLANS.
FILING HEREWITH PILE CAPS AND SLABS SPANNING TO PILE CAPS AS PER PLANS.
FILING HEREWITH SUPPORT OF EXCAVATION AS PER PLANS.
FILING HEREWITH INSTALLATION OF PRE-CONSTRUCTION TEST PILES AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION