Installation of 43.6 kw solar energy system on roof. No change of occupancy, use or egress
Installation of 79.57 kw solar energy system on roof. No change of occupancy, use or egress
Installation of 40.875 kw solar energy system on roof. No change of occupancy, use or egress
Installation of 40.875 kw solar energy system on roof. No change of occupancy, use or egress
Installation of 80.115 kw solar energy system on roof. No change of occupancy, use or egress
Installation of 85.565 kw solar energy system on roof. No change of occupancy, use or egress.
Installation of 37.605 kw solar energy system on roof. No change of occupancy, use or egress
Installation of 80.115 kw solar energy system on roof. No change of occupancy, use or egress
REMOVE AND REPLACE HOT WATER HEATERS AND WATER LINES, RECIRCULATION PUMPS, DRAINS . INSTALL NEW SUMP PUMPS AND DISCHARGE LINES. INSTALL NEW AIR INTAKES AND EXHAUST FOR WATER HEATERS.
NYCHA BOILER_REMOVE AND REPLACE OR PROVIDE NEW SUMP PUMPS AND DISCHARGE LINES.
NYCHA BOILER_REPLACEMENT OF EXISTING VACUUM AND CONDENSATE PUMPS, INSTALLATION OF COMBUSTION AIR DUCTWORK AND FLUES FOR NEW DOMESTIC AND HOT WATER HEATERS.
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
Replacement of existing vacuum/condensate pumps, exhaust fan, sum pumps, piping. Replacement of existing hot water tanks and piping with gas-fired water heaters. New exterior side-wall flue to the roof. Installation of new gas piping. Replacement of doors
RAVENSWOOD HOUSES (BUILDING #24), INSTALLATION OF 8 FEET HIGH CONSTRUCTION FENCE IN CONJUNCTION WITH DOB # Q00455303 TO SECURE THE STAGING AREA. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
REPLACEMENT OF EXISTING VACUUM AND CONDENSATE PUMPS, INSTALLATION OF COMBUSTION AIR DUCTWORK AND FLUES FOR NEW DOMESTIC AND HOT WATER HEATERS.
Replacement of existing vacuum/condensate pumps, exhaust fan, sum pumps, piping. Replacement of existing hot water tanks and piping with gas-fired water heaters. New exterior side-wall flue to the roof. Installation of new gas piping. Replacement of doors
NYCHA BOILER_REPLACEMENT OF EXISTING VACUUM AND CONDENSATE PUMPS, INSTALLATION OF COMBUSTION AIR DUCTWORK AND FLUES FOR NEW DOMESTIC AND HOT WATER HEATERS.
REPLACEMENT OF EXISTING VACUUM AND CONDENSATE PUMPS, INSTALLATION OF COMBUSTION AIR DUCTWORK AND FLUES FOR NEW DOMESTIC AND HOT WATER HEATERS.
NYCHA BOILER_REPLACEMENT OF EXISTING VACUUM AND CONDENSATE PUMPS, INSTALLATION OF COMBUSTION AIR DUCTWORK AND FLUES FOR NEW DOMESTIC AND HOT WATER HEATERS.
RAVENSWOOD HOUSES (BUILDING #21), INSTALLATION OF 8 FEET HIGH CONSTRUCTION FENCE IN CONJUNCTION WITH DOB # Q00455285 TO SECURE THE STAGING AREA. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Replacement of existing vacuum/condensate pumps, exhaust fan, sum pumps, piping. Replacement of existing hot water tanks and piping with gas-fired water heaters. New exterior side-wall flue to the roof. Installation of new gas piping. Replacement of doors
NYCHA BOILER_Replacement of existing vacuum pumps, exhaust fan, sum pumps, piping. Replacement of existing hot water tanks and piping with gas-fired water heaters. New exterior side-wall flue to the roof. Installation of new gas piping.Replacement of door
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
Replacement of existing vacuum/condensate pumps, exhaust fan, sum pumps, piping. Replacement of existing hot water tanks and piping with gas-fired water heaters. New exterior side-wall flue to the roof. Installation of new gas piping. Replacement of doors
Replacement of existing vacuum/condensate pumps, exhaust fan, sum pumps, piping. Replacement of existing hot water tanks and piping with gas-fired water heaters. New exterior side-wall flue to the roof. Installation of new gas piping.Replacement of doors
NYCHA BOILER_REPLACEMENT OF EXISTING VACUUM AND CONDENSATE PUMPS, INSTALLATION OF COMBUSTION AIR DUCTWORK AND FLUES FOR NEW DOMESTIC AND HOT WATER HEATERS.
removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
NYCHA BOILER_REPLACEMENT OF EXISTING VACUUM AND CONDENSATE PUMPS, INSTALLATION OF COMBUSTION AIR DUCTWORK AND FLUES FOR NEW DOMESTIC AND HOT WATER HEATERS.
NYCHA BOILER_REPLACEMENT OF EXISTING VACUUM AND CONDENSATE PUMPS, INSTALLATION OF COMBUSTION AIR DUCTWORK AND FLUES FOR NEW DOMESTIC AND HOT WATER HEATERS.
NYCHA BOILER_Removal and replacement of existing condensate pump concrete pads
RAVENSWOOD HOUSES (BUILDING #18), INSTALLATION OF 8 FEET HIGH CONSTRUCTION FENCE IN CONJUNCTION WITH DOB # Q00455231 TO SECURE THE STAGING AREA. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
RAVENSWOOD HOUSES (BUILDING #19), INSTALLATION OF 8 FEET HIGH CONSTRUCTION FENCE IN CONJUNCTION WITH DOB # Q00455265 TO SECURE THE STAGING AREA. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
NYCHA BOILER_REPLACEMENT OF EXISTING VACUUM AND CONDENSATE PUMPS, INSTALLATION OF COMBUSTION AIR DUCTWORK AND FLUES FOR NEW DOMESTIC AND HOT WATER HEATERS.
Replacement of existing vacuum pumps, exhaust fan, sum pumps, piping. Replacement of existing hot water tanks and piping with gas-fired water heaters. New exterior side-wall flue to the roof. Installation of new gas piping.Replacement of doors and windows
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
Replacement of existing vacuum/condensate pumps, exhaust fan, sum pumps, piping. Replacement of existing hot water tanks and piping with gas-fired water heaters. New exterior side-wall flue to the roof. Installation of new gas piping. Replacement of doors
Replacement of existing vacuum pumps, exhaust fan, sum pumps, piping. Replacement of existing hot water tanks and piping with gas-fired water heaters. New exterior side-wall flue to the roof. Installation of new gas piping.Replacement of doors and windows
RAVENSWOOD HOUSES (BUILDING #20), INSTALLATION OF 8 FEET HIGH CONSTRUCTION FENCE IN CONJUNCTION WITH DOB # Q00455281 TO SECURE THE STAGING AREA. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
NYCHA BOILER_MOVE AND REPLACE HOT WATER HEATERS AND WATER LINES, RECIRCULATION PUMPS, DRAINS . INSTALL NEW SUMP PUMPS AND DISCHARGE LINES. INSTALL NEW AIR INTAKES AND EXHAUST FOR WATER HEATERS.
REMOVE AND REPLACE OR PROVIDE NEW SUMP PUMPS AND DISCHARGE LINES.
RAVENSWOOD HOUSES - BUILDING #18, INSTALLATION OF TEMPORARY SHORING AND SUPPORT FOR EXCAVATION IN CONJUNCTION WITH DOB # Q00996841. NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
NYCHA BOILER_REMOVE AND REPLACE HOT WATER HEATERS AND WATER LINES, RECIRCULATION PUMPS, DRAINS . INSTALL NEW SUMP PUMPS AND DISCHARGE LINES. INSTALL NEW AIR INTAKES AND EXHAUST FOR WATER HEATERS.
RAVENSWOOD HOUSES - BUILDING #23, INSTALLATION OF TEMPORARY SHORING AND SUPPORT FOR EXCAVATION IN CONJUNCTION WITH DOB # Q00455293, Q01010442. NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
NYCHA BOILER_REMOVE AND REPLACE HOT WATER HEATERS AND WATER LINES, RECIRCULATION PUMPS, DRAINS . INSTALL NEW SUMP PUMPS AND DISCHARGE LINES. INSTALL NEW AIR INTAKES AND EXHAUST FOR WATER HEATERS.
NYCHA BOILER_REMOVE AND REPLACE HOT WATER HEATERS AND WATER LINES, RECIRCULATION PUMPS, DRAINS . INSTALL NEW SUMP PUMPS AND DISCHARGE LINES. INSTALL NEW AIR INTAKES AND EXHAUST FOR WATER HEATERS.
NYCHA BOILER_REMOVE AND REPLACE HOT WATER HEATERS AND WATER LINES, RECIRCULATION PUMPS, DRAINS . INSTALL NEW SUMP PUMPS AND DISCHARGE LINES. INSTALL NEW AIR INTAKES AND EXHAUST FOR WATER HEATERS.