Foundations for future electric light pole installation.
Remove existing walkway bonded aggregate paving and replace with cast-in-place concrete paving. No change to walkway layout, occupancy, or egress. Install equipment pads and lighting pole base supports for future electric light installation.
INSTALLATION OF CONSTRUCTION FENCE AT THE HIGHLINE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR FENCE INSTALLED ON SIDEWALK / ROADWAY.
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION AT THE HIGHLINE, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Install of temp platform, scenic exhibit, no alt to exist structures for Target Fashion Week. TPA not reqd. Producer is responsible to monitor site safety & implement HWAP. All prod equip removed upon event complete
INSTALL TEMPORARY SUPPORT FOR ONE (1) TEMPORARY ART EXHIBIT (PIGEON SCULPTURE) AT HIGH LINE PARK. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Structural work associated with new precast concrete stairs at 20th, 26th and 28th Street including foundations for the stairs.
REPAIR OF EXTERIOR EAST STAIR AT HIGH LINE PARK. NO CHANGE IN USE, EGRESS OR OCCUPANCY
INSTALL TEMPORARY SUPPORT FOR TEMPORARY ART EXHIBIT (FALL SCULPTURES) AT HIGHLINE PARK FOR THE DURATION OF ONE (1) YEAR. SCULPTURES TO BE ON VIEW 08/24/2024 - 08/23/2025. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Deck repair and related Landscaping work at the Highline 10th Ave Square.
STRUCTURAL WORK TO REPLACE OF DETERIORATED WOOD DECK SUBSTRUCTURE WITH NEW WOOD FRAMING REPLACEMENT OF TREE PIT COVER FRAMES AT THE HIGH LINE 10TH AVE SQUARE.
Temporary structure application to be used on a temporary event Amazon Holiday Party. All the Installations shall be removed upon completion of the event.
Installation of temp trussing & sculpture with alum members, no alt to exist structures for Reverie Activation. TPA not required. Producer responsible to monitor site safety & implement HWAP. All production equipment removed upon event completion
Temporary structures for a fashion show at The Spur, W30th section of the Highline. Removed at the end of the programing. No changes to existing structures, use or egress.
INSTALL TEMPORARY SUPPORT FOR ONE (1) TEMPORARY ART EXHIBIT (THE OLD TREE) AT HIGHLINE PARK FOR THE DURATION OF ONE (1) YEAR. SCULPTURES TO BE ON VIEW 04/10/2023 - 04/09/2024. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Install SOE in conjunction with new vault.
Installation of temporary exhibit, Car Max exhibit. No alteration to exist structures. TPA permit is not required. Producer is responsible to monitor site safety & implement HWAP. All production equipment removed upon event completion.
INSTALL TEMPORARY SUPPORT FOR THREE (3) TEMPORARY ART STRUCTURES AT HIGHLINE PARK FOR THE DURATION OF ONE (1) YEAR. SCULPTURES TO BE ON VIEW 04/03/2022 - 04/02/2023. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Installation of temporary exhibit, steel arch with alum trussing. No alteration to exist structures. TPA permit is not required. Producer is responsible to monitor site safety & implement HWAP. All production equipment removed upon event completion.
Structural work associated with creating opening between existing High Line and new adjacent structure.
Create opening between the existing High Line and new adjacent elevated structure. Adjacent structure filed under M00545855-I1. No change in use, egress or occupancy.
Structural work associated with temporary art installation. No change in use, egress or occupancy.
INSTALL TEMPORARY SUPPORT FOR SIX (6) TEMPORARY ART STRUCTURES AT HIGHLINE PARK FOR THE DURATION OF ONE (1) YEAR. SCULPTURES TO BE ON VIEW 04/03/2021 - 04/02/2022. NO CHANGE IN USE, EGRESS OR OCCUPANCY
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK BRIDGE DURING CONSTRUCTION FOR PEDESTRIAN SAFETY FOR THE WORK BEING DONE ON THE HIGH LINE AS PER PLANS. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.